Presentation of a multi-index clustering technique for the mathematical programming of block-cave scheduling

被引:0
|
作者
Farshad Nezhadshahmohammad [1 ]
Yashar Pourrahimian [2 ]
Hamid Aghababaei [3 ]
机构
[1] Urmia University
[2] School of Mining and Petroleum Engineering,University of Alberta
[3] Sahand University of Technology
关键词
Production scheduling; Block-cave mining; Multi-similarity index clustering; Draw control system; Production rate curve;
D O I
暂无
中图分类号
TD801 [矿山开采理论];
学科分类号
081901 ;
摘要
Long-term planning is one of the most important stages that determines the distribution of cash flows over the mine life and the feasibility of the project. However, it is not feasible in block caving to generate a production schedule that will provide optimal operating strategies without considering geotechnical constraints. This paper develops a mixed-integer linear programming(MILP) model to optimize the extraction sequence of drawpoints over multiple time horizons of block-cave mines with respect to the draw control systems. A multi-similarity index clustering technique to solve the MILP model in a reasonable time is also presented. Application and comparison of production scheduling based on the draw control system and clustering technique are illustrated using 325 drawpoints over 15 periods. The results show a significant reduction in the size of the MILP model, and in the time required to solve it.
引用
收藏
页码:941 / 950
页数:10
相关论文
共 34 条
  • [1] Presentation of a multi-index clustering technique for the mathematical programming of block-cave scheduling
    Nezhadshahmohammad, Farshad
    Pourrahimian, Yashar
    Aghababaei, Hamid
    [J]. INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2018, 28 (06) : 941 - 950
  • [2] Conditional draw control system in block-cave production scheduling using mathematical programming
    Nezhadshahmohammad, F.
    Aghababaei, H.
    Pourrahimian, Y.
    [J]. INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2019, 33 (04) : 223 - 246
  • [3] A multi-step approach for block-cave production scheduling optimization
    Yashar Pourrahimian
    Hooman Askari-Nasab
    Dwayne D.Tannant
    [J]. International Journal of Mining Science and Technology, 2013, 23 (05) : 739 - 750
  • [4] A multi-step approach for block-cave production scheduling optimization
    Pourrahimian, Yashar
    Askari-Nasab, Hooman
    Tannant, Dwayne D.
    [J]. INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2013, 23 (05) : 739 - 750
  • [5] An application of mathematical programming to determine the best height of draw in block-cave sequence optimisation
    Pourrahimian, Y.
    Askari-Nasab, H.
    [J]. TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2014, 123 (03): : 162 - 172
  • [6] Multicriterial multi-index resource scheduling problems
    Prilutskii, M. Kh.
    [J]. JOURNAL OF COMPUTER AND SYSTEMS SCIENCES INTERNATIONAL, 2007, 46 (01) : 78 - 82
  • [7] Multicriterial multi-index resource scheduling problems
    M. Kh. Prilutskii
    [J]. Journal of Computer and Systems Sciences International, 2007, 46 : 78 - 82
  • [8] The Research of Similarity with Multi-Index Based on Structural Clustering
    Tan, Chengjie
    Tang, Xuqing
    [J]. INTERNATIONAL CONFERENCE ON FRONTIERS OF ENERGY, ENVIRONMENTAL MATERIALS AND CIVIL ENGINEERING (FEEMCE 2013), 2013, : 359 - 365
  • [9] A Multi-Index Fusion Clustering Strategy for Traffic Flow State Identification
    Bao, Di
    [J]. IEEE ACCESS, 2019, 7 : 166404 - 166409
  • [10] Multi-Index Technique for Metadata Management in Private Cloud Storage
    Prabavathy, B.
    Devi, Subha M.
    Babu, Chitra
    [J]. 2013 INTERNATIONAL CONFERENCE ON RECENT TRENDS IN INFORMATION TECHNOLOGY (ICRTIT), 2013, : 84 - 89