A multi-step approach for block-cave production scheduling optimization

被引:0
|
作者
Yashar Pourrahimian [1 ]
Hooman Askari-Nasab [1 ]
Dwayne D.Tannant [2 ]
机构
[1] Department of Civil and Environmental Engineering,School of Mining and Petroleum Engineering,University of Alberta
[2] School of Engineering,University of British Columbia
关键词
Block caving; Aggregation; Production scheduling; MILP; CPLEX;
D O I
暂无
中图分类号
TD672 [电子计算机的应用];
学科分类号
0819 ;
摘要
Production schedules that provide optimal operating strategies while meeting practical,technical,and environmental constraints are an inseparable part of mining operations.Relying only on manual planning methods or computer software based on heuristic algorithms will lead to mine schedules that are not the optimal global solution.Mathematical mine planning models have been proved to be very effective in supporting decisions on sequencing the extraction of material in mines.The objective of this paper is to develop a practical optimization framework for caving operations’production scheduling.To overcome the size problem of mathematical programming models and to generate a robust practical near-optimal schedule,a multi-step method for long-term production scheduling of block caving is presented.A mixed-integer linear programming(MILP)formulation is used for each step.The formulations are developed,implemented,and verifed in the TOMLAB/CPLEX environment.The production scheduler aims to maximize the net present value of the mining operation while the mine planner has control over defned constraints.Application and comparison of the models for production scheduling using 298 drawpoints over 15 periods are presented.
引用
收藏
页码:739 / 750
页数:12
相关论文
共 50 条
  • [1] A multi-step approach for block-cave production scheduling optimization
    Pourrahimian, Yashar
    Askari-Nasab, Hooman
    Tannant, Dwayne D.
    [J]. INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2013, 23 (05) : 739 - 750
  • [2] Conditional draw control system in block-cave production scheduling using mathematical programming
    Nezhadshahmohammad, F.
    Aghababaei, H.
    Pourrahimian, Y.
    [J]. INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2019, 33 (04) : 223 - 246
  • [3] Presentation of a multi-index clustering technique for the mathematical programming of block-cave scheduling
    Farshad Nezhadshahmohammad
    Yashar Pourrahimian
    Hamid Aghababaei
    [J]. International Journal of Mining Science and Technology, 2018, 28 (06) : 941 - 950
  • [4] Presentation of a multi-index clustering technique for the mathematical programming of block-cave scheduling
    Nezhadshahmohammad, Farshad
    Pourrahimian, Yashar
    Aghababaei, Hamid
    [J]. INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2018, 28 (06) : 941 - 950
  • [5] Optimal Pruning for Multi-Step Sensor Scheduling
    Huber, Marco F.
    [J]. IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 2012, 57 (05) : 1338 - 1343
  • [6] A Multi-Step Optimization Approach for Power Flow with Transient Stability Constraints
    Moreno Alamo, Ana Cecilia
    Costa Alberto, Luis Fernando
    [J]. 2015 IEEE EINDHOVEN POWERTECH, 2015,
  • [7] A MULTI-STEP OPTIMIZATION APPROACH TO DISTRIBUTED COGENERATION SYSTEMS WITH HEAT STORAGE
    Campanari, Stefano
    Manzolini, Giampaolo
    Silva, Paolo
    [J]. PROCEEDINGS OF THE ASME TURBO EXPO 2008, VOL 7, 2008, : 295 - 304
  • [8] Multi-step production of a diphoton resonance
    Dobrescu, Bogdan A.
    Fox, Patrick J.
    Kearney, John
    [J]. JOURNAL OF PHYSICS G-NUCLEAR AND PARTICLE PHYSICS, 2017, 44 (06)
  • [9] Multi-Step Gradient Methods for Networked Optimization
    Ghadimi, Euhanna
    Shames, Iman
    Johansson, Mikael
    [J]. IEEE TRANSACTIONS ON SIGNAL PROCESSING, 2013, 61 (21) : 5417 - 5429
  • [10] Illumination system design with multi-step optimization
    Magarill, Simon
    Cassarly, William J.
    [J]. NONIMAGING OPTICS: EFFICIENT DESIGN FOR ILLUMINATION AND SOLAR CONCENTRATION XII, 2015, 9572