Construction project investment control model based on instant information

被引:0
|
作者
王学通
机构
[1] China School of Economics and Management Guangzhou University Guangzhou 510006
[2] School of Management Harbin Institute of Technology
[3] Harbin 150001
关键词
instant information; investment; mode; compute;
D O I
暂无
中图分类号
F224 [经济数学方法];
学科分类号
0701 ; 070104 ;
摘要
Change of construction conditions always influences project investment by causing the loss of construction work time and extending the duration. To resolve such problem as difficult dynamic control in work construction plan, this article presents a concept of instant optimization by ways of adjustment operation time of each working procedure to minimize investment change. Based on this concept, its mathematical model is established and a strict mathematical justification is performed. An instant optimization model takes advantage of instant information in the construction process to duly complete adjustment of construction; thus we maximize cost efficiency of project investment.
引用
收藏
页码:374 / 378
页数:5
相关论文
共 50 条
  • [1] Cost Control System Building Based on Government Investment Construction Project
    Wu, Zhen-quan
    Liu, Fang
    Xu, Xiao-yun
    [J]. PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: INNOVATION AND PRACTICE IN INDUSTRIAL ENGINEERING AND MANAGEMENT (VOL 2), 2016, : 695 - 705
  • [2] Research on Control Measures and Problems of Investment Control of Construction Project
    Yan, Liu
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON MECHATRONICS, ELECTRONIC, INDUSTRIAL AND CONTROL ENGINEERING, 2015, 8 : 1668 - 1671
  • [3] Research of schedule control and investment control based on the workbench of information system project surveillance
    Liu, H. Z.
    Wang, W.
    Zhu, Y.
    Zhao, Q. L.
    Pan, Y. S.
    [J]. FRONTIERS IN ENTERPRISE INTEGRATION, 2008, : 101 - 109
  • [4] Construction Project Investment Risk Evaluation Model Based on RBF Neural Network
    Zhang, Chuang yi
    Shi, Xiu qin
    [J]. PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION (ICMS2009), VOL 4, 2009, : 418 - 421
  • [5] NOVEL MODEL ON ASSESSMENT OF CONSTRUCTION PROJECT INVESTMENT ENVIRONMENT
    Li, Yancang
    Zhao, Lei
    Li, Rouya
    [J]. PAKISTAN JOURNAL OF STATISTICS, 2013, 29 (06): : 989 - 998
  • [6] Audio/visual information in construction project control
    Abudayyeh, O
    [J]. ADVANCES IN ENGINEERING SOFTWARE, 1997, 28 (02) : 97 - 101
  • [7] Talk on the Investment Control of Engineering Project Supervisor in Construction Stage
    Feng, Huihong
    Chen, Jingsi
    [J]. FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 432 - 435
  • [8] OO information model for construction project management
    Karim, A
    Adeli, H
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1999, 125 (05) : 361 - 367
  • [9] Geopolitical model of investment power station construction project implementation
    Malafeyev, Oleg
    Farvazov, Konstantin
    Zenovich, Olga
    Zaitseva, Irina
    Kostyukov, Konstantin
    Svechinskaya, Tatiana
    [J]. INTERNATIONAL CONFERENCE ON ELECTRICAL, ELECTRONICS, MATERIALS AND APPLIED SCIENCE, 2018, 1952
  • [10] Linking guide to Construction Project Information Model design for improved Construction Project Management
    Xu, YX
    Wang, YW
    Yao, B
    [J]. PROCEEDINGS OF 2005 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 508 - 511