A Dependent-Chance Programming Model for Proactive Scheduling

被引:0
|
作者
柯华 [1 ]
王磊 [1 ]
黄虎 [1 ]
机构
[1] School of Economics and Management,Tongji University
关键词
project scheduling; genetic algorithm(GA); dependent-chance programming(DCP); stochastic activity durations; proactive scheduling;
D O I
10.19884/j.1672-5220.2015.02.005
中图分类号
O221 [规划论(数学规划)];
学科分类号
070105 ; 1201 ;
摘要
Proactive scheduling based on expected value model is an effective method to develop robust schedules in consideration of minimizing project cost caused by deviations between realized and planed activity starting times.However,these schedules may be realized with low probabilities.In this paper,a novel model based on dependent-chance programming(DCP) is proposed,considering probability as well as solution robustness.A hybrid intelligent algorithm integrating stochastic simulation and genetic algorithm(GA)is designed to solve the proposed model.Moreover,a numerical example is conducted to reveal the effectiveness of the proposed model and the algorithm.
引用
收藏
页码:199 / 202
页数:4
相关论文
共 50 条