Optimization of Equipment Maintenance Strategy Based on Availability

被引:0
|
作者
张友诚
机构
关键词
maintenance strategy; optimization; availability;
D O I
暂无
中图分类号
TD407 [机械安装、运行与维护];
学科分类号
0819 ;
摘要
It is very important to optimize maintenance strategy in maintenance plan. Proper parameters play a decisive role for the optimization. In the opinion of writer, availability is a basic parameter, failure consequence cost and failure characteristic are also important parameters. Maintenance strategy can be optimized on the base by means of quantitative analysis and diagram.
引用
收藏
页码:49 / 53
页数:5
相关论文
共 50 条
  • [41] MAINTENANCE STRATEGY BASED ON EQUIPMENT RELIABILITY ANALYSIS OF A PULP BALING LINE
    Angeli, Moacyr
    Scalzer, André Frederico
    [J]. O Papel, 2020, 81 (12): : 75 - 85
  • [42] INTEGRATED DECISION ON SPARE PARTS ORDERING AND EQUIPMENT MAINTENANCE UNDER CONDITION BASED MAINTENANCE STRATEGY
    Wang, Yabin
    Zhao, Jianmin
    Cheng, Zhonghua
    Yang, Zhiyuan
    [J]. EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2015, 17 (04): : 591 - 599
  • [43] Research on Optimization of Equipment Maintenance Plan
    Zhou Fujiang
    Zhu Xiaodo
    Chen Hongwen
    [J]. 2010 INTERNATIONAL COLLOQUIUM ON COMPUTING, COMMUNICATION, CONTROL, AND MANAGEMENT (CCCM2010), VOL I, 2010, : 278 - 280
  • [44] Maintenance optimization of equipment by linear programming
    Jayakumar, A
    Asgarpoor, S
    [J]. 2004 INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS, 2004, : 145 - 149
  • [45] Operation-maintenance strategy optimization based on efficiency-cost sensitivity analysis for secondary equipment of intelligent substation
    Wang Y.
    Ying L.
    Tao H.
    Yang L.
    [J]. Tao, Haiyang (690930408@qq.com), 1600, Electric Power Automation Equipment Press (36): : 182 - 188
  • [46] Maintenance optimization of equipment by linear programming
    Jayakumar, A
    Asgarpoor, S
    [J]. PROBABILITY IN THE ENGINEERING AND INFORMATIONAL SCIENCES, 2006, 20 (01) : 183 - 193
  • [47] Availability-Based Optimization of Preventive Maintenance Schedule: A Parametric Study
    Dadhich, Vikas
    Roy, Sandip
    [J]. PRES 2010: 13TH INTERNATIONAL CONFERENCE ON PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, 2010, 21 : 949 - 954
  • [48] The Optimization Analysis of Equipment Maintenance based on Monte-Carlo Simulation
    Geng, DAi
    Zhang, Shimin
    Wang, Deguo
    Gao, Jian
    Dai, Lisha
    [J]. MANUFACTURING PROCESS TECHNOLOGY, PTS 1-5, 2011, 189-193 : 424 - 427
  • [49] Reserch on the Equipment Maintenance Tasks Scheduling Optimization Problem based on GA
    Ma Yi
    Lu Yu
    Chen Liyun
    Gu Ping
    [J]. MANAGEMENT, MANUFACTURING AND MATERIALS ENGINEERING, PTS 1 AND 2, 2012, 452-453 : 750 - 754
  • [50] Equipment Disassembly and Maintenance in an Uncertain Environment Based on a Peafowl Optimization Algorithm
    Liu, Jiang
    Zhan, Changshu
    Liu, Zhiyong
    Zheng, Shuangqing
    Wang, Haiyang
    Meng, Zhou
    Xu, Ruya
    [J]. PROCESSES, 2023, 11 (08)