Erratum to:Development of a Theory of Constraints Based Scheduling System for Ship Piping Production

被引:0
|
作者
李瑞 [1 ,2 ]
濵甲邦裕 [1 ]
下反贵裕 [1 ]
机构
[1] Graduate School of Engineering,Hiroshima University
[2] School of Naval Architecture,Dalian University of Technology
关键词
Erratum to;
D O I
暂无
中图分类号
学科分类号
摘要
<正>~~
引用
收藏
页码:512 / 512
页数:1
相关论文
共 50 条
  • [1] Erratum to: Development of a Theory of Constraints Based Scheduling System for Ship Piping Production
    Rui Li
    Kunihiro Hamada
    Takahiro Shimozori
    [J]. Journal of Shanghai Jiaotong University (Science), 2010, 15 (4) : 512 - 512
  • [2] Development of a Theory of Constraints Based Scheduling System for Ship Piping Production
    李瑞
    濵田邦裕
    下反贵裕
    [J]. Journal of Shanghai Jiaotong University(Science), 2010, 15 (03) : 354 - 362
  • [3] Development of a theory of constraints based scheduling system for ship piping production
    Li R.
    Hamada K.
    Shimozori T.
    [J]. Journal of Shanghai Jiaotong University (Science), 2010, 15 (3) : 354 - 362
  • [4] Research on the ITOC based scheduling system for ship piping production
    Li R.
    Liu Y.
    Hamada K.
    [J]. Journal of Marine Science and Application, 2010, 9 (4) : 355 - 362
  • [5] Research of Production Scheduling Based on Theory of Constraints
    Zhang, X. M.
    Du, Y. L.
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ELECTRICAL, AUTOMATION AND MECHANICAL ENGINEERING (EAME 2015), 2015, 13 : 142 - 145
  • [6] The Production Scheduling Problem of Aluminum Casting Based on Theory of Constraints
    Peng Pin
    Chen Enhu
    [J]. MEMS, NANO AND SMART SYSTEMS, PTS 1-6, 2012, 403-408 : 3666 - +
  • [7] Research on the ITOC Based Solutions for Ship-Piping Jobshop Scheduling
    Li, Rui
    Liu, Yujun
    Hamada, Kunihiro
    [J]. ADVANCED MANUFACTURING TECHNOLOGY, PTS 1-3, 2011, 314-316 : 2046 - +
  • [8] Research for Production Scheduling of Discrete Manufacturing Enterprise Based on the Theory of Constraints
    Huang Zongxiang
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL II, 2008, : 167 - 171
  • [9] Research on marine ship production scheduling system based on Multi-Agent System
    Peng, Fei
    Zheng, Li
    Gong, Ming
    Zhou, Hui
    [J]. DESALINATION AND WATER TREATMENT, 2021, 219 : 60 - 65
  • [10] Development of production scheduling system based on carton production process
    Song, XM
    Liu, QF
    Wu, YH
    [J]. NEW TRENDS OF INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT IN NEW CENTURY, 2001, : 288 - 294