Stochastic Earned Duration Analysis for Project Schedule Management

被引:0
|
作者
Fernando Acebes [1 ]
David Poza [1 ]
José Manuel González-Varona [1 ]
Adolfo López-Paredes [1 ]
机构
[1] GIR INSISOC-Department of Business Organization and CIM, School of Industrial Engineering, University of Valladolid
关键词
D O I
暂无
中图分类号
TU722 [施工计划];
学科分类号
1201 ;
摘要
Earned duration management(EDM) is a methodology for project schedule management(PSM) that can be considered an alternative to earned value management(EVM). EDM provides an estimation of deviations in schedule and a final project duration estimation. There is a key difference between EDM and EVM: In EDM, the value of activities is expressed as work periods; whereas in EVM, value is expressed in terms of cost. In this paper, we present how EDM can be applied to monitor and control stochastic projects. To explain the methodology, we use a real case study with a project that presents a high level of uncertainty and activities with random durations. We analyze the usability of this approach according to the activities network topology and compare the EVM and earned schedule methodology(ESM) for PSM.
引用
收藏
页码:148 / 161
页数:14
相关论文
共 50 条
  • [11] Project Duration Forecasting Using Earned Duration Management with Exponential Smoothing Techniques
    Khamooshi, Homayoun
    Abdi, Abdollah
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (01)
  • [12] Earned Duration Management (EDM) Analysis of Duration Control Process: A Case of Telecommunication Infrastructure Development Project
    Irliani, Wilda
    Arviansyah
    [J]. EDUCATION EXCELLENCE AND INNOVATION MANAGEMENT: A 2025 VISION TO SUSTAIN ECONOMIC DEVELOPMENT DURING GLOBAL CHALLENGES, 2020, : 1023 - 1034
  • [14] Prediction of project outcome The application of statistical methods to earned value management and earned schedule performance indexes
    Lipke, Walt
    Zwikael, Ofer
    Henderson, Kym
    Anbari, Frank
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (04) : 400 - 407
  • [15] Earned schedule: An emerging enhancement to earned value management
    Lipke, Walt
    Henderson, Kym
    [J]. CrossTalk, 2006, 19 (11): : 26 - 30
  • [16] Cost/Schedule Monitoring and Forecasting for Project Based on Earned Value Management (EVM)
    Huang, Jianwen
    Pan, Huimin
    Li, Yan
    Zhu, Yiting
    Liao, Zaiyi
    [J]. ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 1437 - +
  • [17] Multivariate control charts using earned value and earned duration management observations to monitor project performance
    Votto, Rodrigo
    Ho, Linda Lee
    Berssaneti, Fernando
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 148
  • [18] Applying and Assessing Performance of Earned Duration Management Control Charts for EPC Project Duration Monitoring
    Votto, Rodrigo
    Lee Ho, Linda
    Berssaneti, Fernando
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (03)
  • [19] Stability and accuracy of deterministic project duration forecasting methods in earned value management
    Barrientos-Orellana, Alexis
    Ballesteros-Perez, Pablo
    Mora-Melia, Daniel
    Gonzalez-Cruz, Maria Carmen
    Vanhoucke, Mario
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (03) : 1449 - 1469
  • [20] Earned value project management
    Fleming, Quentin W.
    Koppelman, Joel M.
    [J]. Cost Engineering (Morgantown, West Virginia), 1997, 39 (02): : 13 - 15