共 50 条
- [1] Stochastic Earned Duration Analysis for Project Schedule Management [J]. Engineering, 2022, 9 (02) : 148 - 161
- [2] Stochastic Earned Duration Analysis for Project Schedule Management [J]. ENGINEERING, 2022, 9 : 148 - 161
- [4] Project Duration Forecasting by Effective Earned Schedule [J]. 2010 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING (MSE 2010), VOL 1, 2010, : 321 - 323
- [5] Project Management Model: Integrating Earned Schedule, Quality, and Risk in Earned Value Management [J]. 2019 IEEE 6TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA), 2019, : 622 - 628
- [7] Dangers in using earned duration and other earned value metrics to measure a project’s schedule performance [J]. Central European Journal of Operations Research, 2023, 31 : 665 - 680