共 50 条
- [41] NETWORK APPROACH TO A MULTI-FACILITY, MULTI-PRODUCT PRODUCTION SCHEDULING PROBLEM WITHOUT BACKORDERING [J]. MANAGEMENT SCIENCE SERIES A-THEORY, 1975, 21 (07): : 813 - 822
- [42] A mixed-integer linear programming for scheduling a multi-product pipeline with dual-purpose terminals [J]. COMPUTATIONAL & APPLIED MATHEMATICS, 2015, 34 (03): : 979 - 1007
- [43] A mathematical model for scheduling of real-world tree-structured multi-product pipeline system [J]. Mathematical Methods of Operations Research, 2015, 81 : 53 - 81
- [44] A mixed-integer linear programming for scheduling a multi-product pipeline with dual-purpose terminals [J]. Computational and Applied Mathematics, 2015, 34 : 979 - 1007
- [46] Scheduling multi-product tree-structure pipelines [J]. COMPUTERS & CHEMICAL ENGINEERING, 2011, 35 (01) : 165 - 176
- [48] MULTI-PRODUCT PRODUCTION SCHEDULING IN AUTOMATED CONTINUOUS PROCESSES [J]. BULLETIN OF THE JSME-JAPAN SOCIETY OF MECHANICAL ENGINEERS, 1975, 18 (118): : 450 - 457
- [49] ECONOMIC BATCH SIZE DETERMINATION FOR MULTI-PRODUCT SCHEDULING [J]. OPERATIONS RESEARCH, 1958, 6 (06) : 894 - 894