Trial of small gateroad pillar in top coal caving longwall mining of large mining height

被引:0
|
作者
Li Huamin [1 ]
Syd Peng [2 ]
Li Huigui [1 ]
Xu Yongxiang [1 ]
Yuan Ruifu [1 ]
Yue Shuaishuai [1 ]
Li Kun [1 ]
机构
[1] School of Energy Science and Engineering,Henan Polytechnic University
[2] Department of Mining Engineering,West Virginia University
关键词
Large mining height; Small gateroad pillar; Top coal caving longwall mining; Hydraulic fracturing; Gob-side entry driving;
D O I
暂无
中图分类号
TD823.4 [];
学科分类号
摘要
Coal seams in Tashan Mine of Datong Coal Group in China average 15 m thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 3.8 m and the top coal caving height was 11.2 m. The gateroad pillar between panels was 38 m. During retreat mining,serious bumps occurred in the gateroads on both sides of the pillar affecting safety production. Therefore,pillarless mining was experimented. Using numerical modeling and comparative study of cases of similar mining condition,it was decided to employ a 6 m wide pillar,rather than the previous 38 m wide pillar.Support system for the gateroads was designed and implemented. During gateroad development,pillar failure conditions and entry deformation were monitored. Hydraulic fracturing method was employed to cut off the K3 sandstone along the entry rib so as to reduce the abutment pressure induced during retreat mining. Support reinforcement method combining grouting and advanced reinforcement methods was proposed to insure stable gateroad ahead of mining. Methane drainage and nitrogen injection were implemented to eliminate hazards associated with mine fire and spontaneous combustion. Since the development of gateroad has just completed,and retreat mining has not begun,the effectiveness of the proposed methods is unknown at this point. However,monitoring will continue until after mining.The results will be published in a separate paper.
引用
收藏
页码:139 / 147
页数:9
相关论文
共 50 条
  • [21] Improving the top coal recovery ratio in longwall top coal caving mining using drawing balance analysis
    Yang, Liu
    Wang, Jiachen
    Yang, Shengli
    Li, Lianghui
    Wu, Shanxi
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2023, 37 (05) : 319 - 337
  • [22] Study of gas permeability in top-coal during mechanical longwall top-coal caving mining
    Cheng, Guo-Ming
    Wu, Jian
    Wang, Si-Jing
    Xiangtan Kuangye Xueyuan Xuebao/Journal of Xiangtan Mining Institute, 2002, 17 (04):
  • [23] 3D numerical modeling of longwall mining with top-coal caving
    Yasitli, NE
    Unver, B
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2005, 42 (02) : 219 - 235
  • [24] Structure and deformation measurements of shallow overburden during top coal caving longwall mining
    Li Sheng
    Fan Chaojun
    Luo Mingkun
    Yang Zhenhua
    Lan Tianwei
    Zhang Haifeng
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2017, 27 (06) : 1081 - 1085
  • [25] Effect of upward angle on the drawing mechanism in longwall top-coal caving mining
    Yang, Shengli
    Zhang, Jinwang
    Chen, Yi
    Song, Zhengyang
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2016, 85 : 92 - 101
  • [26] ECONOMICAL OPTIMIZATION OF THE MECHANIZED LONGWALL FACES WITH TOP COAL CAVING MINING, IN HORIZONTAL SLICES
    Onica, Ilie
    Mihailescu, Viorel
    Andrioni, Felicia
    ARCHIVES OF MINING SCIENCES, 2016, 61 (03) : 651 - 676
  • [27] Structure and deformation measurements of shallow overburden during top coal caving longwall mining
    Li Sheng
    Fan Chaojun
    Luo Mingkun
    Yang Zhenhua
    Lan Tianwei
    Zhang Haifeng
    InternationalJournalofMiningScienceandTechnology, 2017, 27 (06) : 1081 - 1085
  • [28] Simulation of recovery of upper remnant coal pillar while mining the ultra-close lower panel using longwall top coal caving
    Guorui Feng
    Pengfei Wang
    InternationalJournalofMiningScienceandTechnology, 2020, 30 (01) : 55 - 61
  • [29] Adaptability of longwall top coal caving with high cutting height
    Mao, De-Bing
    Yao, Jian-Guo
    Meitan Xuebao/Journal of the China Coal Society, 2010, 35 (11): : 1837 - 1841
  • [30] Simulation of recovery of upper remnant coal pillar while mining the ultra-close lower panel using longwall top coal caving
    Feng, Guorui
    Wang, Pengfei
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2020, 30 (01) : 55 - 61