Turbine efficiency test on a large hydraulic turbine unit

被引:0
|
作者
YAN ZongGuo1
2 State Key Laboratory of Hydroscience and Engineering
机构
基金
中国国家自然科学基金;
关键词
hydraulic turbine; efficiency test; flow rate measurement; CFD calculations; measurement uncertainty;
D O I
暂无
中图分类号
TK730 [一般性问题];
学科分类号
摘要
The flow rate measurements are the most difficult part of efficiency tests on prototype hydraulic turbines.Among the numerous flow rate measurement methods,the Winter Kennedy method is preferred for measuring turbine flow rates,since it is convenient,practical and economical.This paper describes efficiency tests on a large 300 MW Francis turbine,with the flow rate measured using the Winter Kennedy method and the Winter Kennedy flow rate coefficient calibrated using the Gibson method.The measured turbine efficiency curve is then compared with the curve provided by the manufacturer.The CFD calculations including the spiral case are then used to analyze the influence with the coefficient K and index n in the Winter Kennedy flow rate formula on the flow rate measurement.The uncertainty values of n and K are a key reason for the differences between the curves obtained from the efficiency test and the curves provided by the manufacturer.
引用
收藏
页码:2199 / 2205
页数:7
相关论文
共 50 条
  • [31] Technologies for High Efficiency Large Capacity Turbine Generator
    Taniyama, Yoshihiro
    Ueda, Takashi
    Fujita, Masafumi
    Okamoto, Tetsushi
    Arata, Masanori
    Katayama, Hitoshi
    Nagakura, Ken
    Otaka, Toru
    2009 INTERNATIONAL CONFERENCE ON ELECTRICAL MACHINES AND SYSTEMS, VOLS 1-3, 2009, : 333 - 338
  • [32] EFFICIENCY MEASUREMENT WITH UNCERTAINTY ESTIMATES FOR A PELTON TURBINE GENERATING UNIT
    Aguirre, L. A.
    Fonseca, A. R.
    Torres, L. A. B.
    Martinez, C. B.
    LATIN AMERICAN APPLIED RESEARCH, 2010, 40 (01) : 91 - 98
  • [33] CFD Analysis of The Hydraulic Turbine Draft Tube to Improve System Efficiency
    Chakrabarty, Spandan
    Sarkar, Bikash Kr
    Maity, Subhendu
    2015 INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING AND ELECTRICAL SYSTEMS (ICMES 2015), 2016, 40
  • [34] Efficiency limit factor analysis for the Francis-99 hydraulic turbine
    Zeng, Y.
    Zhang, L. X.
    Guo, J. P.
    Guo, Y. K.
    Pan, Q. L.
    Qian, J.
    FRANCIS-99 WORKSHOP 2: TRANSIENT OPERATION OF FRANCIS TURBINES, 2017, 782
  • [35] Calculation of Economic Efficiency of New Prototypes of Hydraulic Turbine Equipment.
    Fridman, L.I.
    Trampol'skii, V.D.
    Petrova, E.M.
    Energomashinostroenie, 1976, (03): : 12 - 14
  • [36] Experimental and Numerical Simulations Predictions Comparison of Power and Efficiency in Hydraulic Turbine
    Castro, Laura
    Urquiza, Gustavo
    Adamkowski, Adam
    Reggio, Marcelo
    MODELLING AND SIMULATION IN ENGINEERING, 2011, 2011
  • [37] A new bladeless hydraulic turbine
    Beran, V.
    Sedlacek, M.
    Marsik, F.
    APPLIED ENERGY, 2013, 104 : 978 - 983
  • [38] HYDRAULIC TURBINE SETTING CRITERIA
    RUUD, FO
    JOURNAL OF ENGINEERING FOR POWER, 1965, 87 (03): : 295 - &
  • [39] Practical hydraulic turbine model
    Izena, Atsushi
    Kihara, Hidemi
    Shimojo, Toshikuu
    Hirayama, Kaiichirou
    Furukawa, Nobuhiko
    Kageyama, Takahisa
    Goto, Takashi
    Okamura, Chosei
    2006 POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-9, 2006, : 3837 - 3843
  • [40] HYDRAULIC TURBINE SETTING CRITERIA
    RUUD, FO
    MECHANICAL ENGINEERING, 1965, 87 (02) : 71 - &