The closure of third stage diversion channel for the Three Gorges Dam is characterized by large closure discharge, large drop in water surface, and high gap velocity. ID and 2D flow mathematical models were used in this paper to simulate the hydraulic conditions during the closure. The variation of discharge in the diversion channel and the drops in water surface shared by the upstream and downstream cofferdams were computed using the ID model, and the detailed hydraulic patterns in the diversion channel were simulated using the 2D model. The computed results indicate that the designed closure scheme for discharge of 9,010 m3/s was feasible for construction, while the designed closure scheme for discharge of 12,200 m3/s was inapplicable.
引用
收藏
页码:75 / 82
页数:8
相关论文
共 50 条
  • [21] Quantifying the effects of channel change on the discharge diversion of Jingjiang Three Outlets after the operation of the Three Gorges Dam
    Li, Yanyan
    Yang, Guishan
    Li, Bing
    Wan, Rongrong
    Duan, Weili
    He, Zheng
    HYDROLOGY RESEARCH, 2016, 47 : 161 - 174
  • [22] Calculation and prediction of the dyke end slump for deep water closure of the Three Gorges Project
    Zhou, Hougui
    Liu, Guangting
    Wang, Guangqian
    Qinghua Daxue Xuebao/Journal of Tsinghua University, 2002, 42 (04): : 535 - 538
  • [24] Back analysis on the material parameters of the second stage cofferdam in the Three Gorges Project
    Zhang, Xiaoping
    Bao, Chenggang
    Shi, Bin
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2001, 20 (05): : 731 - 737
  • [25] The innovation of construction in the III-stage of RCC cofferdam of the Three Gorges Project
    Wang, DM
    Dai, ZQ
    Sha, BW
    ROLLER COMPACTED CONCRETE DAMS, 2003, : 531 - 536
  • [26] Temperature changes in Three Gorges Reservoir Area and linkage with Three Gorges Project
    Song, Zhen
    Liang, Shunlin
    Feng, Lian
    He, Tao
    Song, Xiao-Peng
    Zhang, Lei
    JOURNAL OF GEOPHYSICAL RESEARCH-ATMOSPHERES, 2017, 122 (09) : 4866 - 4879
  • [27] Influence of Channel Adjustment of Guanzhou Reach on Flow Diversion at Songzikou After Impoundment of Three Gorges Reservoir
    Huang L.
    Liu S.
    Gongcheng Kexue Yu Jishu/Advanced Engineering Sciences, 2018, 50 (01): : 22 - 27
  • [28] Finding academic concerns of the Three Gorges Project based on a topic modeling approach
    Jiang HanChen
    Qiang MaoShan
    Lin Peng
    ECOLOGICAL INDICATORS, 2016, 60 : 693 - 701
  • [29] Three Gorges Project:Relocating People
    $$$$TANG SHUBIAO
    China Today, 1995, (03) : 25 - 27
  • [30] Floodwater utilization of the Three Gorges Project
    董前进
    Journal of Chongqing University(English Edition), 2009, 8 (02) : 82 - 88