Mechanics of rib spalling of high coal walls under fully-mechanized mining

被引:0
|
作者
Yuan Yong~(a
机构
关键词
HCWFM; Rib spalling; Damage mechanics; Control technology;
D O I
暂无
中图分类号
TD823.9 [];
学科分类号
081901 ;
摘要
In order to solve the problem of rib spalling of high coal walls in fully-mechanized(HCWFM)mines,we used the principle of damage mechanics to analyze coal wall rib spalling.The results show that coal wall rib spalling is,to a certain degree,a macro-performance of the development of micro-cracks.We built a mechanical model to simulate the damage to the front of coal walls,carried out theoretical calculations of the damage parameters,analyzed the effect of mining height,original cracks,seam strength,horizontal stress,vertical displacement of the coal walls and other parameters on coal wall rib spalling, which conform well with the results of our field measurements and numerical simulation.The key to control coal wall rib spalling is to control the development of cracks in coal walls.Accelerating the speed of advancing the working face,improving the setting load of support and the horizontal force of the guard board,strengthening coal walls and other technical measures can effectively reduce the degree of damage to the coal walls and control coal wall rib spalling at HCWFM faces.
引用
收藏
页码:129 / 133
页数:5
相关论文
共 50 条
  • [32] Power supply technology of safety and high efficiency fully-mechanized coal mining technology working face of modernized mine
    Tao, Xue-Yi
    Shang, Yao-Shi
    Meitan Xuebao/Journal of the China Coal Society, 2010, 35 (11): : 1930 - 1934
  • [33] Mechanism and practice of support release of mining roadway about fully-mechanized top-coal caving mining stope
    Li, Chong
    Xu, Jin-Hai
    Wu, Rui
    Dong, Jian-Tao
    Meitan Xuebao/Journal of the China Coal Society, 2011, 36 (12): : 2018 - 2023
  • [34] High development characteristics of water flowing fractured zone in fully-mechanized top-caving mining of extremely thick coal seam under water
    Li X.
    Huang Q.
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2022, 39 (01): : 54 - 61
  • [35] Method for determining the load on and width of coal pillar at the recovery room end of fully-mechanized longwall mining
    Gu, Shuancheng
    Wang, Bonan
    Huang, Rongbin
    Miao, Yanping
    Zhongguo Kuangye Daxue Xuebao/Journal of China University of Mining and Technology, 2015, 44 (06): : 990 - 995
  • [36] Detecting Research on Mining Fracture Depth of the Fully-Mechanized Face Floor's in Taoyuan Coal Mine
    Wu Jiwen
    Gong Shilong
    Zhang Pingsong
    Zhang Zhi
    2011 INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS AND NEURAL COMPUTING (FSNC 2011), VOL VI, 2011, : 502 - 505
  • [37] Study of caving pattern of regenerated roof in fully-mechanized slicing mining of steeply dipping coal seam
    Chi Xiao-lou
    Yang Ke
    Liu Wen-jie
    Fu Qiang
    Wei Zhen
    ROCK AND SOIL MECHANICS, 2022, 43 (05) : 1391 - 1400
  • [38] Study on digital twin-based smart fully-mechanized coal mining workface monitoring technology
    Chi H.
    Yuan Z.
    Cao Y.
    Hu D.
    Song Z.
    Meitan Kexue Jishu/Coal Science and Technology (Peking), 2021, 49 (10): : 153 - 161
  • [39] Influence study on rock pressure of the len th of fully-mechanized coal face with large mining height
    Kang Quanyu
    Hu Qing
    Wang Yunlong
    Progress in Mining Science and Safety Technology, Pts A and B, 2007, : 341 - 346
  • [40] Detecting Research on Mining Fracture Depth of the Fully-Mechanized Face Floor's in Taoyuan Coal Mine
    Wu Jiwen
    Gong Shilong
    Zhang Pingsong
    Zhang Zhi
    2011 AASRI CONFERENCE ON INFORMATION TECHNOLOGY AND ECONOMIC DEVELOPMENT (AASRI-ITED 2011), VOL 3, 2011, : 279 - 282