MILP Model for Plant-Wide Optimal By-Product Gas Scheduling in Iron and Steel Industry

被引:0
|
作者
KONG Hai-ning
机构
基金
中国国家自然科学基金;
关键词
iron and steel industry; MILP; by-product gas distribution; scheduling;
D O I
10.13228/j.boyuan.issn1006-706x.2010.07.007
中图分类号
TF758 [炼钢厂];
学科分类号
080602 ;
摘要
The scheduling of by-product gases in by-product gas system,cogeneration system and production system is studied.All gas-consuming users are divided into three kinds according to their different characters and then a distribution model is built.A dynamic mixed integer linear programming(MILP)model for multiperiod optimization of by-product gas is performed to optimize by-product gas distribution to achieve total cost reduction.Case study shows that 6.2% operation cost is reduced by using the proposed model.
引用
收藏
页码:34 / 37
页数:4
相关论文
共 50 条
  • [41] Knowledge and mathematical programming-based optimal scheduling for byproduct gas system in steel industry
    Sheng, Chunyang
    Zhao, Jun
    [J]. 2017 CHINESE AUTOMATION CONGRESS (CAC), 2017, : 7493 - 7498
  • [42] Evaluation of an Open-source Chemical Process Simulator Using a Plant-wide Oil and Gas Separation Plant Flowsheet Model as Basis
    Andreasen, Anders
    [J]. PERIODICA POLYTECHNICA-CHEMICAL ENGINEERING, 2022, 66 (03) : 503 - 511
  • [43] Plant-wide model-based analysis of iron dosage strategies for chemical phosphorus removal in wastewater treatment systems
    Mbamba, C. Kazadi
    Lindblom, E.
    Flores-Alsina, X.
    Tait, S.
    Anderson, S.
    Saagi, R.
    Batstone, D. J.
    Gernaey, K. V.
    Jeppsson, U.
    [J]. WATER RESEARCH, 2019, 155 : 12 - 25
  • [44] Plant-wide assessment of high-pressure membrane contactors in natural gas sweetening - Part I: Model development
    Quek, Ven Chian
    Shah, Nilay
    Chachuat, Benoit
    [J]. SEPARATION AND PURIFICATION TECHNOLOGY, 2021, 258
  • [45] Byproduct Gas Optimal Distribution Model and Its Application for Iron and Steel Enterprises
    Du Tao
    Liu Xiangbin
    Pang Xinglu
    [J]. INFORMATION TECHNOLOGY FOR MANUFACTURING SYSTEMS II, PTS 1-3, 2011, 58-60 : 816 - 821
  • [46] Optimal Simulation Model of Gas System balance and Distribution in Iron and Steel Works
    Zhang Xiao-lei
    An Zhen-gang
    [J]. LEMLID: 2008 NORTHEAST ASIA LOGISTICS ENGINEERING AND MODERN LOGISTICS INDUSTRY DEVELOPMENT, PROCEEDINGS, 2008, : 126 - 130
  • [47] Study on Dynamic Optimization Model of Surplus Gas Distribution in Iron and Steel Plant
    Song Jun
    Zhang An-chao
    Zheng Hai-kun
    [J]. PROGRESS IN ENVIRONMENTAL SCIENCE AND ENGINEERING, PTS 1-4, 2013, 610-613 : 2228 - 2231
  • [48] Optimal scheduling of a byproduct gas system in a steel plant considering time-of-use electricity pricing
    Zhao, Xiancong
    Bai, Hao
    Shi, Qi
    Lu, Xin
    Zhang, Zhihui
    [J]. APPLIED ENERGY, 2017, 195 : 100 - 113
  • [49] An investigation on optimum grinding system and conditions for steel plant ARP by-product α-Fe2O3 for pigment industry
    Karakas, Ozgur
    Kanca, Erdogan
    [J]. ENGINEERING SCIENCE AND TECHNOLOGY-AN INTERNATIONAL JOURNAL-JESTECH, 2020, 23 (05): : 1266 - 1272
  • [50] An Optimal Product Mix Decision Model Considering Unit-Batch-Product Level Cost for Steel Plant
    Lu, Hu-sheng
    Lv, Guo-qiang
    [J]. PROCEEDINGS OF 2012 3RD INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION (IEMI2012), 2013, : 147 - 157