共 50 条
- [2] MILP Model for Plant-Wide Optimal By-Product Gas Scheduling in Iron and Steel Industry [J]. Journal of Iron and Steel Research International, 2010, 17 : 34 - 37
- [3] Study of the optimization scheduling based on by-product gas model in iron and steel enterprises [J]. Energy Education Science and Technology Part A: Energy Science and Research, 2013, 31 (04): : 2455 - 2468
- [4] Online Strategy for Scheduling By-product Gas Consumption and Adjusting Gas Holder Level in Iron and Steel Industry [J]. ADVANCES IN APPLIED SCIENCE AND INDUSTRIAL TECHNOLOGY, PTS 1 AND 2, 2013, 798-799 : 263 - +
- [6] Plant-wide optimal byproduct gas distribution and holder level control in the iron and steel making process [J]. Korean Journal of Chemical Engineering, 2003, 20 : 429 - 435
- [7] Dynamic forecasting and optimal scheduling of by-product gases in integrated iron and steel works [J]. Journal of Iron and Steel Research International, 2019, 26 : 529 - 546
- [9] Multiperiod optimal byproduct gas scheduling in iron and steel industry [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2010, 30 (11): : 2071 - 2079