Inspection and preventive maintenance optimization of electrographite brushes for a hydrogenerator unit in the Brazilian interconnected power system

被引:0
|
作者
Salles, Gisele Maria de Oliveira [3 ]
Baracy, Yago Lafourcade [1 ,2 ]
Venturini, Lucas Fritzen [1 ,2 ]
Weigert-Dalagnol, Gabriela Rosalee [3 ]
Benedito, Raphael Augusto de Souza [3 ]
Issicaba, Diego [1 ,2 ]
机构
[1] Univ Fed Santa Catarina, Florianopolis, SC, Brazil
[2] INESC P&D Brasil, Santos, SP, Brazil
[3] Univ Tecnol Fed Parana, Curitiba, PR, Brazil
关键词
Carbon brush collectors; Conditional value-at-risk; Maintenance scheduling; Monte Carlo simulation;
D O I
10.1016/j.rineng.2024.103770
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The possibility of shutdown due to the wearing of carbon-brush collectors is a major concern on turbine-generators and one of the most frequent motives for preventive maintenance. This paper introduces an approach to estimate the optimal inspection and maintenance periods of carbon-brush collectors used in hydrogenerator units through an algorithm procedure based on sequential Monte Carlo simulation. The approach is characterized by the probabilistic representation of brush wearing and associated emergency stops using real data from a hydroelectric generator unit; the stochastic modeling of inspection as well as preventive and corrective maintenance activities; and the application of a conditional value-at-risk indicator dictated by contracted thresholds of generation unavailability. The approach has been tested with real data from a Brazilian electric utility, providing information on how to safely reduce the number of maintenance periods per year, thus further improving the availability of the generating units. For the generator unit under analysis, optimal values have been found using inspections and preventive maintenances each 0.0192 and 0.8290 years, respectively, considering the expected costs of the worst 3% simulated scenarios.
引用
收藏
页数:10
相关论文
共 50 条
  • [21] Experience and applications of phasor measurements to the Brazilian interconnected power system
    Decker, Ildemar C.
    Silva, Aguinaldo S. e
    Agostini, Marcelo N.
    Prioste, Fernando B.
    Mayer, Breno T.
    Dotta, Daniel
    EUROPEAN TRANSACTIONS ON ELECTRICAL POWER, 2011, 21 (04): : 1557 - 1573
  • [22] Optimization of the preventive maintenance plan of a series components system
    Caldeira Duarte, Jose A.
    Craveiro, Joao C. Taborda A.
    Trigo, Tomas Pedro
    INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 2006, 83 (04) : 244 - 248
  • [23] Estimation and Optimization for System Availability Under Preventive Maintenance
    Raghav, Yashpal Singh
    Mradula
    Varshney, Rahul
    Modibbo, Umar Muhammad
    Ahmadini, Abdullah Ali H.
    Ali, Irfan
    IEEE ACCESS, 2022, 10 : 94337 - 94353
  • [24] AVAILABILITY OF A 2-UNIT REDUNDANT SYSTEM WITH PREVENTIVE MAINTENANCE
    SUBRAMANIAN, R
    RAVICHANDRAN, N
    IEEE TRANSACTIONS ON RELIABILITY, 1978, 27 (01) : 73 - 74
  • [25] OPTIMUM PREVENTIVE MAINTENANCE POLICY FOR A 1-UNIT SYSTEM
    OHASHI, M
    NISHIDA, T
    IEEE TRANSACTIONS ON RELIABILITY, 1980, 29 (02) : 174 - 174
  • [26] Compilation and Optimization of Nuclear Power Plant Preventive Maintenance Program
    Zhang, Sheng
    Mo, Chun-Ni
    Chen, Yu
    Qu, Meng
    Huang, Li-Jun
    Fu, Ju
    Wang, Qing-Qing
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON QUALITY, RELIABILITY, RISK, MAINTENANCE, AND SAFETY ENGINEERING (QR2MSE), VOLS I-IV, 2013, : 748 - 753
  • [27] Preventive maintenance optimization to improve quality in electrical power systems
    Muzi, F
    NINTH ISSAT INTERNATIONAL CONFERENCE ON RELIABILITY AND QUALITY IN DESIGN, 2003 PROCEEDINGS, 2003, : 320 - 324
  • [28] A new genetic algorithm for preventive unit maintenance scheduling of power systems
    Wang, Y
    Handschin, E
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2000, 22 (05) : 343 - 348
  • [29] Age Estimation of Electrographite Brush in Generator System for Optimized Maintenance Planning of Sirikit Hydro Power Plant
    Kate-singnoy, Witcha
    Premrudeepreechacharn, Suttichai
    2014 NORTH AMERICAN POWER SYMPOSIUM (NAPS), 2014,
  • [30] Preventive Maintenance Optimization in Hybrid Solar Gas Power System using Gravitational Search Algorithm
    Meziane, Rachid
    Hamzi, Amar
    Boufala, Seddik
    Amara, Mohamed
    PROCEEDINGS OF 2015 3RD IEEE INTERNATIONAL RENEWABLE AND SUSTAINABLE ENERGY CONFERENCE (IRSEC'15), 2015, : 210 - 218