Multi-stage Market Operation Optimization of Virtual Power Plant Considering Flexible Load

被引:0
|
作者
Chen, Wuxiao [1 ]
Yan, Yi [2 ,3 ]
Zhou, Botao [2 ,3 ]
Guo, Song [2 ,3 ]
Lin, Han [1 ]
Liu, Xuying [1 ]
机构
[1] State Grid Fujian Mkt Serv Ctr, Fuzhou, Peoples R China
[2] Nari Grp Corp, Res Dept, State Grid Elect Power Res Inst, Nanjing, Peoples R China
[3] Wuhan Efficiency Evaluat Co Ltd, Res Dept, State Grid Elect Power Res Inst, Wuhan, Peoples R China
关键词
flexible load; multi-stage market; demand response; virtual power plant;
D O I
10.1109/ICPST61417.2024.10602284
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In order to improve the energy utilization efficiency and promote the development and utilization of flexible load. this paper considers the aggregation of flexible load in virtual power plants, and carries out the optimization research on the trading strategy of virtual power plants participating in multistage markets. Firstly, the operation framework of the virtual power plant with aggregate flexible adjustable resources is designed, and each unit in the virtual power plant is modeled. Secondly, the framework of virtual power plant participating in multistage market trading is proposed, and the joint trading optimization strategy of virtual power plant participating in demand response market, peaking auxiliary service market and electricity energy market is constructed. Finally, a typical day is selected from the four seasons of spring, summer, autumn and winter respectively, and a certain region is taken as an example for example analysis to verify the effectiveness of the model.
引用
收藏
页码:1383 / 1394
页数:12
相关论文
共 50 条
  • [1] Optimization of the Flexible Virtual Power Plant Operation in Modern Power System
    Lesniak, Adam
    2018 15TH INTERNATIONAL CONFERENCE ON THE EUROPEAN ENERGY MARKET (EEM), 2018,
  • [2] Optimized Operation of Multi-Virtual Power Plant for Energy Sharing Based on Nash Multi-Stage Robust
    Wang, Yong
    Wang, Haiyun
    Du, Xin
    IEEE ACCESS, 2024, 12 : 169805 - 169823
  • [3] Distributed Cooperative Optimal Operation of Multiple Virtual Power Plants Based on Multi-Stage Robust Optimization
    Cheng, Lin
    Li, Yuling
    Yang, Shiyou
    SUSTAINABILITY, 2024, 16 (13)
  • [4] Multi-Stage Transmission Network Planning Considering Transmission Congestion in the Power Market
    Huang, Yixin
    Liu, Xinyi
    Zhang, Zhi
    Yang, Li
    Lin, Zhenzhi
    Dan, Yangqing
    Sun, Ke
    Lan, Zhou
    Zhu, Keping
    ENERGIES, 2020, 13 (18)
  • [5] Research on Robust operation optimization of virtual power plant considering PV output uncertainty and load aggregation characteristics
    Jia Xiaoqiang
    Zhang Xin-he
    Liu Kai-cheng
    He Gui-xiong
    2024 IEEE 2ND INTERNATIONAL CONFERENCE ON POWER SCIENCE AND TECHNOLOGY, ICPST 2024, 2024, : 1395 - 1404
  • [6] Rolling-window Multi-stage Stochastic Programming for a Virtual Power Plant in the Real-time Market
    Luo, Zhe
    Guo, Ye
    Sun, Hongbin
    2021 IEEE POWER & ENERGY SOCIETY GENERAL MEETING (PESGM), 2021,
  • [7] Two-stage distributionally robust optimization operation of virtual power plant considering the virtual energy storage of electric vehicles
    Wang, Bowen
    Jiang, Yong
    Jiang, Minglei
    Ma, Kerui
    Frontiers in Energy Research, 2024, 12
  • [8] Coordinated operation of electric vehicle charging and wind power generation as a virtual power plant: A multi-stage risk constrained approach
    Abbasi, Mohammad Hossein
    Taki, Mehrdad
    Rajabi, Amin
    Li, Li
    Zhang, Jiangfeng
    APPLIED ENERGY, 2019, 239 : 1294 - 1307
  • [9] Multi-stage Optimization Model for Electricity Spot Market Clearing Considering Carbon Trading
    Dong F.
    Chi L.
    Meng Z.
    Dianwang Jishu/Power System Technology, 2024, 48 (01): : 79 - 90
  • [10] Two-stage Distributionally Robust Optimization Operation Strategy of Virtual Power Plants Considering Flexible Ramping Products
    Yu, Hongfei
    Wang, Yunchu
    Lyu, Ruiyang
    Jin, Luosong
    Lin, Zhenzhi
    Yang, Li
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2024, 48 (14): : 16 - 27