Optimized Operation of Multi-Virtual Power Plant for Energy Sharing Based on Nash Multi-Stage Robust

被引:0
|
作者
Wang, Yong [1 ]
Wang, Haiyun [1 ]
Du, Xin [2 ]
机构
[1] Xinjiang Univ, Engn Res Ctr Educ Minist Renewable Energy Power Ge, Urumqi 830047, Peoples R China
[2] Goldwind Sci & Technol Co Ltd, Beijing 100176, Peoples R China
来源
IEEE ACCESS | 2024年 / 12卷
关键词
Uncertainty; Electricity; Cogeneration; Optimal scheduling; Optimization; Costs; Resistance heating; Power generation; Games; Renewable energy sources; Nash equilibrium; Virtual power plant; electric vehicle; stackelberg game; multi-stage robust optimization; nash game; nested C&CG algorithm;
D O I
10.1109/ACCESS.2024.3477970
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Currently, the research on virtual power plant (VPP) is mainly divided into internal optimal scheduling and external optimal scheduling, the internal scheduling is mainly carried out from the two sides of the source and load and the application of market mechanism, while the external scheduling is in line with the current diversified power market, and considers the synergistic operation with other VPPs. Therefore, To address the problems faced by VPP in dispatch operation, such as the low economic efficiency of VPPs operating independently and the high impact of grid electricity prices and source-load uncertainty on the safe and stable operation of VPPs, a method for energy sharing operation based on Nash multi-stage robust optimization for multi-VPP is proposed. Firstly, in order to coordinate the economic interests conflict between the operators of the VPP and electric vehicle (EV) users, the Stackelberg game theory is adopted to characterize the interactive behavior between the VPP operator and the EV users. Meanwhile, a multi-stage robust optimization model is used to construct the upper-level entity, taking into account the uncertainty of price-source-load. Unlike traditional models, this paper utilizes a min-maxmin-maxmin construction to describe the internal relationships of the model. Based on this, a multi-VPP energy sharing optimization framework is established using a Nash game. It combines robust optimization with Nash bargaining theory to create a multi-VPP Nash multi-stage robust optimization model. Additionally, nested C&CG algorithms are combined with ADMM algorithms is proposed in order to solve this model effectively. Finally, three multi-energy VPPs were selected for case study analysis in this paper, and the effectiveness of the proposed method was validated through simulation. Finally, through the case study, the results show that the optimization method proposed in this paper is feasible, after the optimization of the Nash three-stage robust model, in the face of the impact of multiple uncertainties, the cooperative operation of each VPP to enhance the revenue of 396.40 yuan, 610.75 yuan, 732.53 yuan, respectively, compared with the independent operation of the operating cost of each VPP have been significantly reduced, and the system load demand of each VPP can be fully satisfied.
引用
收藏
页码:169805 / 169823
页数:19
相关论文
共 50 条
  • [1] Optimal operation of multi-integrated energy system based on multi-level Nash multi-stage robust
    Zhang, Zongnan
    Fedorovich, Kudashev Sergey
    APPLIED ENERGY, 2024, 358
  • [2] Distributed Cooperative Optimal Operation of Multiple Virtual Power Plants Based on Multi-Stage Robust Optimization
    Cheng, Lin
    Li, Yuling
    Yang, Shiyou
    SUSTAINABILITY, 2024, 16 (13)
  • [3] Multi-stage Market Operation Optimization of Virtual Power Plant Considering Flexible Load
    Chen, Wuxiao
    Yan, Yi
    Zhou, Botao
    Guo, Song
    Lin, Han
    Liu, Xuying
    2024 IEEE 2ND INTERNATIONAL CONFERENCE ON POWER SCIENCE AND TECHNOLOGY, ICPST 2024, 2024, : 1383 - 1394
  • [4] Multi-source shared operation optimization strategy for multi-virtual power plants based on distributionally robust chance constraint
    Wen, Jiaxing
    Jia, Rong
    Cao, Ge
    Guo, Yi
    Jiao, Yang
    Li, Wei
    Li, Peihang
    ENERGY, 2025, 322
  • [5] Shared energy storage-multi-microgrid operation strategy based on multi-stage robust optimization
    Siqin, Tana
    He, Shan
    Hu, Bing
    Fan, Xiaochao
    JOURNAL OF ENERGY STORAGE, 2024, 97
  • [6] Robust Multi-stage Power Grid Operations with Energy Storage
    Zou, Yihan
    Lin, Xiaojun
    Aliprantis, Dionysios
    Chen, Minghua
    IEEE CONFERENCE ON COMPUTER COMMUNICATIONS (IEEE INFOCOM 2018), 2018, : 2483 - 2491
  • [7] Joint bidding strategy of multi-virtual power plant operators
    Du, Jiyu
    Zhao, Yi
    Sun, Wenyao
    Qian, Xiaoyi
    ENGINEERING REPORTS, 2024,
  • [8] The Virtual Power Plant Bidding Strategy Model based on Multi-stage Semi-anticipativity Distributionally Robust Optimization
    Li, Wei
    ELECTRIC POWER SYSTEMS RESEARCH, 2024, 237
  • [9] Distributed Resource Aggregation and Aggregate Optimization Operation Method of Multi-virtual Power Plant in New Power Distribution Network
    Xu Z.
    Liu Z.
    He J.
    Si F.
    Wang X.
    Gaodianya Jishu/High Voltage Engineering, 2024, 50 (01): : 105 - 119
  • [10] Coordinated operation of electric vehicle charging and wind power generation as a virtual power plant: A multi-stage risk constrained approach
    Abbasi, Mohammad Hossein
    Taki, Mehrdad
    Rajabi, Amin
    Li, Li
    Zhang, Jiangfeng
    APPLIED ENERGY, 2019, 239 : 1294 - 1307