LRFD Resistance Factors for Base-Grouted Drilled Shafts in Cohesionless Soil

被引:0
|
作者
Sarsour, Anhar [1 ,4 ]
Gunaratne, Manjriker [2 ,5 ]
Mullins, Gray [3 ,5 ]
机构
[1] Assistant Project Manager, Kiewit Infrastructure South, Miami, FL 33184 USA
[2] Univ S Florida, Dept Civil & Environm Engn, Tampa, FL 33620 USA
[3] Univ S Florida, Dept Civil & Environm Engn, Tampa, FL 33620 USA
[4] Kiewit Infrastruct South, 14558 SW 8th St, Miami, FL 33184 USA
[5] Univ S Florida, Dept Civil & Environm Engn, Tampa, FL 33620 USA
关键词
Postgrouting; Base grouting; Load and resistance factor design (LRFD); Resistance factor; Effective grouting; SIDE RESISTANCE; PILES;
D O I
10.1061/JGGEFK.GTENG-12538
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Base grouting below a drilled shaft tipped in sand has been shown in many cases to dramatically improve both the initial stiffness and ultimate end-bearing resistance. After promising results from base-grouting case studies in the early 1960s, numerous grouting methods were developed, but end-bearing prediction methods remained largely proprietary for over 40 years, none of which were provided via design codes or specifications. No safety factors or resistance factors for any design method had been codified prior to this study. Instead, load test verifications routinely were performed, and the safety or resistance factor associated with the test method was applied. This paper assigned resistance factors for base-grouted end bearing from the results of 35 base-grouted shafts that were load-tested throughout the United States. Like other geotechnical capacity prediction methods (e.g., driven pile capacity), a higher resistance factor is established when increased field inspection is implemented, specifically when grout pressure verification demonstrates that the end-bearing soils have been effectively grouted to the specified design pressure. (c) 2024 American Society of Civil Engineers.
引用
收藏
页数:12
相关论文
共 22 条
  • [11] Calibration of Side, Tip, and Total Resistance Factors for Load and Resistance Factor Design of Drilled Shafts
    Abu-Farsakh, Murad Y.
    Yu, Xinbao
    Zhang, Zhongjie
    TRANSPORTATION RESEARCH RECORD, 2012, (2310) : 38 - 48
  • [12] Load transfer analysis of rock-socketed drilled shafts by coupled soil resistance
    Seol, Hoonil
    Jeong, Sangseom
    Kim, Yongmin
    COMPUTERS AND GEOTECHNICS, 2009, 36 (03) : 446 - 453
  • [13] Robustness of Constant Load and Resistance Factor Design Factors for Drilled Shafts in Multiple Strata
    Ching, Jianye
    Phoon, Kok-Kwang
    Chen, Jie-Ru
    Park, Jae Hyun
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2013, 139 (07) : 1104 - 1114
  • [14] Analysis of soil resistance on drilled shafts using proposed cyclic p-y curves in weathered soil
    Jeong, Sangseom
    Park, Jeongsik
    Ko, Junyoung
    Kim, Byungchul
    GEOMECHANICS AND ENGINEERING, 2017, 12 (03) : 505 - 522
  • [15] Base resistance of drilled shafts in soft rock using in situ load tests: A limit state approach
    Asem, Pouyan
    SOILS AND FOUNDATIONS, 2019, 59 (06) : 1639 - 1658
  • [16] INFLUENCE FACTORS ON DRILLED-PILE SIDE SOIL RESISTANCE
    Song, Bing
    Cai, Jian
    ISISS '2009: INNOVATION & SUSTAINABILITY OF STRUCTURES, VOLS 1 AND 2, 2009, : 1059 - 1064
  • [17] Structural resistance factors for shear loading in drilled shafts with minor flaws based on experimental study
    Moon S. Nam
    Yongkyu Choi
    KSCE Journal of Civil Engineering, 2007, 11 (5) : 243 - 252
  • [18] Resistance factors for drilled shafts in weak rock based on O-cell test data
    Yang, Xiaoming
    Han, Jie
    Parsons, Robert L.
    Henthorne, Robert W.
    TRANSPORTATION RESEARCH RECORD, 2008, (2045) : 62 - 67
  • [19] Calibrating shaft and base resistance factors for design of drilled shaft foundations
    Bach, D.
    van Gelder, P. H. A. J. M.
    Hudson, M. B.
    SAFETY, RELIABILITY AND RISK ANALYSIS: BEYOND THE HORIZON, 2014, : 2497 - 2505
  • [20] Analysis of resistance factors for LRFD of soil nail pullout limit state using default FHWA load and resistance models
    Hu, Hui
    Lin, Peiyuan
    MARINE GEORESOURCES & GEOTECHNOLOGY, 2020, 38 (03) : 332 - 348