Culvert Inspection Framework Using Hybrid XGBoost and Risk-Based Prioritization: Utah Case Study

被引:0
|
作者
Mohammadi, Pouria [1 ]
Asgari, Sadegh [2 ]
Rashidi, Abbas [1 ]
Alder, Reuel [3 ]
机构
[1] Dept. of Civil and Environmental Engineering, Univ. of Utah, Salt Lake City,UT,84112, United States
[2] Dept. of Civil Engineering, Merrimack College, North Andover,MA,01845, United States
[3] Transportation Performance Management Division, Utah Department of Transportation, Salt Lake City,UT,84114, United States
关键词
Culverts - Markov processes - Risk management - Risk perception;
D O I
10.1061/JCEMD4.COENG-16448
中图分类号
学科分类号
摘要
Resource constraints often prevent Departments of Transportation (DOTs) from performing routine culvert inspections. This study focused on the Utah DOT (UDOT), which lacks a comprehensive culvert management system and faces budgetary constraints for culvert maintenance. These limitations hinder strategic inspection planning and may lead to missed opportunities for preventative maintenance. Without regular inspection, minor defects can escalate into major issues, necessitating costly and extensive repair or replacement that could have been avoided. UDOT's current approach to culvert inspections is reactive, resulting in an incomplete inventory and a failure to safeguard this critical infrastructure effectively. To address this challenge, an intelligent culvert inspection framework was proposed for Utah by integrating a culvert condition prediction model and a risk-based prioritization approach. An eXtreme Gradient Boosting (XGBoost) model was developed as the foundation of the culvert condition prediction model, and five optimization algorithms were employed, namely the gray wolf optimizer (GWO), whale optimization algorithm, moth-flame optimization algorithm, genetic algorithm, and Bayesian optimization algorithm, to tune its hyperparameters and improve its predictive performance. Based on the results, the GWO-XGBoost model outperformed the others. Subsequently, a risk-based strategy was developed using UDOT's maintenance data and the GWO-XGBoost model's output for prioritizing culvert inspections. The case study was conducted on 272 Utah culverts as a validation test and showed the effectiveness of the proposed method for culvert inspection planning by decreasing the cost of culvert failures based on the Monte Carlo simulation results. With this innovative approach, UDOT can allocate resources more efficiently while prioritizing the inspection and maintenance of critical culverts. Furthermore, it optimizes maintenance budgets and resource utilization while improving transportation infrastructure safety and reliability. © 2025 American Society of Civil Engineers.
引用
收藏
相关论文
共 50 条
  • [41] Dealing with disruptions in railway track inspection using risk-based machine learning
    Sakdirat Kaewunruen
    Mohd Haniff Osman
    Scientific Reports, 13
  • [42] Implementation of Lean Knowledge Work in Oil and Gas Industry A Case Study from a Risk-Based Inspection Project
    Rachman, Andika
    Ratnayake, R. M. Chandima
    2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 675 - 680
  • [43] Risk-based inspection planning applied to 14 steel jacket structures in Bass Strait, Australia - Case study
    Barton, AD
    Descamps, B
    PROCEEDINGS OF THE 10TH (2000) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL IV, 2000, : 364 - 371
  • [44] A multiple case study on risk-based testing in industry
    Michael Felderer
    Rudolf Ramler
    International Journal on Software Tools for Technology Transfer, 2014, 16 : 609 - 625
  • [45] A multiple case study on risk-based testing in industry
    Felderer, Michael
    Ramler, Rudolf
    INTERNATIONAL JOURNAL ON SOFTWARE TOOLS FOR TECHNOLOGY TRANSFER, 2014, 16 (05) : 609 - 625
  • [46] Risk-based monitored natural attenuation - a case study
    Khan, FI
    Husain, T
    JOURNAL OF HAZARDOUS MATERIALS, 2001, 85 (03) : 243 - 272
  • [47] Risk-based residual life assessment - A case study
    Maguire, JR
    DAMAGE ASSESSMENT OF STRUCTURES, PROCEEDINGS, 2003, 245-2 : 359 - 366
  • [48] Risk-Based Self-Improving Asset Management Framework for Coastal Protection Structures Using 1+Inspection Points
    El Hakea, Ayman H.
    Sami, Mahmoud
    Badawy, Abdelhay
    Elbeltagi, Emad
    Hosny, Ossama
    Iskander, Moheb
    Abu-Samra, Soliman
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2024, 38 (03)
  • [49] Development of a risk-based multi-criteria approach for watershed prioritization with consideration of soil erosion alleviation (case study of Iran)
    Chitsaz, Nastaran
    Malekian, Arash
    ENVIRONMENTAL EARTH SCIENCES, 2016, 75 (22)
  • [50] Development of a risk-based multi-criteria approach for watershed prioritization with consideration of soil erosion alleviation (case study of Iran)
    Nastaran Chitsaz
    Arash Malekian
    Environmental Earth Sciences, 2016, 75