Cooperation-based bi-level rescheduling method for multi-objective distributed hybrid flow shop with unrelated parallel machines under multi-type disturbances

被引:0
|
作者
Cui, Hanghao [1 ,2 ]
Li, Xinyu [1 ,2 ]
Gao, Liang [1 ,2 ]
Xiang, Zhimou [2 ,3 ]
Zhou, Wei [2 ,3 ]
Yu, Yanbin [2 ,3 ]
Fu, Ling [2 ,3 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Mech Sci & Engn, Wuhan 430070, Peoples R China
[2] HUST Siemens Res Ctr Digital Twin, Res Team Digital Twin Driven Prod Management, Wuhan, Peoples R China
[3] Siemens Technol China, Dept Digital Twin & Prod Optimizat Res, Shanghai, Peoples R China
基金
中国国家自然科学基金;
关键词
Dynamic distributed hybrid flow shop scheduling; unrelated parallel machines; multi-type disturbances; cooperation-based bi-level rescheduling method; greedy job insertion partial rescheduling; improved genetic algorithm; SCHEDULING PROBLEM; DISTRIBUTION ALGORITHM;
D O I
10.1080/0951192X.2025.2478005
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Distributed hybrid flow shop production styles are gaining popularity, and many of them feature unrelated parallel machines (UPMs). However, most existing studies fail to consider or solely focus on a single disturbance type. Moreover, they seldom consider processing stability metrics. To closely resemble real production scenarios, this paper first studies the distributed hybrid flow shop scheduling problem with UPMs under two common disturbances (random arrival of new jobs and machine breakdowns), considering processing efficiency and stability metrics. To solve this problem, a cooperation-based bi-level rescheduling method is designed based on the nature of the problem. Among them, a factory load balancing mechanism is proposed to improve factory assignment schemes rapidly. A greedy job insertion partial rescheduling (first level) and improved genetic algorithm (IGA) (second level) are designed to obtain high-quality inner-factory scheduling schemes. In IGA, a dynamic decoding and guided elite individual optimization strategy are presented to balance conflicting objectives. An adaptive tabu search is designed to improve local search efficiency. The experiments involve 120 randomly generated instances. The results illustrate that the proposed methods are very effective. Compared to other efficient full rescheduling algorithms, IGA performs best in spread, generational distance, and inverted generational distance.
引用
收藏
页数:23
相关论文
共 30 条
  • [11] A multi-class teaching-learning-based optimization for multi-objective distributed hybrid flow shop scheduling
    Lei, Deming
    Su, Bin
    KNOWLEDGE-BASED SYSTEMS, 2023, 263
  • [12] Multi-class teaching-learning-based optimization for multi-objective distributed hybrid flow shop scheduling
    Lei D.-M.
    Su B.
    Kongzhi yu Juece/Control and Decision, 2021, 36 (02): : 303 - 313
  • [13] Multi-population genetic algorithm with greedy job insertion inter-factory neighbourhoods for multi-objective distributed hybrid flow-shop scheduling with unrelated-parallel machines considering tardiness
    Cui, Hanghao
    Li, Xinyu
    Gao, Liang
    Zhang, Chunjiang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (12) : 4427 - 4445
  • [14] An efficient Bi-level hybrid multi-objective reliability-based design optimization of composite structures
    Zadeh, Parviz Mohammad
    Mohagheghi, Mostafa
    COMPOSITE STRUCTURES, 2022, 296
  • [15] A hybrid multi-objective bi-level interactive fuzzy programming method for solving ECM-DWTA problem
    Luda Zhao
    Zongxu An
    Bin Wang
    Yanqiu Zhang
    Yihua Hu
    Complex & Intelligent Systems, 2022, 8 : 4811 - 4829
  • [16] A hybrid multi-objective bi-level interactive fuzzy programming method for solving ECM-DWTA problem
    Zhao, Luda
    An, Zongxu
    Wang, Bin
    Zhang, Yanqiu
    Hu, Yihua
    COMPLEX & INTELLIGENT SYSTEMS, 2022, 8 (06) : 4811 - 4829
  • [17] Solving a new multi-objective unrelated parallel machines scheduling problem by hybrid teaching-learning based optimization
    Sadati, A.
    Tavakkoli-Moghaddam, R.
    Naderi, B.
    Mohammadi, M.
    International Journal of Engineering, Transactions B: Applications, 2017, 30 (02): : 1302 - 1311
  • [18] Multi-objective bi-level photovoltaic access planning based on copula theory and included angle cosine method
    Sun, Ke
    Wang, Lei
    Zhou, Yuyong
    Wang, Junhai
    Zhao, Tianyu
    Ye, Chengjin
    Wang, Guanzhong
    THIRD INTERNATIONAL CONFERENCE ON ENERGY ENGINEERING AND ENVIRONMENTAL PROTECTION, 2019, 227
  • [19] Offspring regeneration method based on bi-level sampling for large-scale evolutionary multi-objective optimization
    Liu, Wei
    Chen, Li
    Hao, Xingxing
    Zhou, Wei
    Cao, Xin
    Xie, Fei
    SWARM AND EVOLUTIONARY COMPUTATION, 2022, 75
  • [20] Decomposition-Based Multi-Objective Optimization for Energy-Aware Distributed Hybrid Flow Shop Scheduling with Multiprocessor Tasks
    Jiang, Enda
    Wang, Ling
    Wang, Jingjing
    TSINGHUA SCIENCE AND TECHNOLOGY, 2021, 26 (05) : 646 - 663