Are more data always better? - Machine learning forecasting of algae based on long-term observations

被引:0
|
作者
Beckmann, D. Atton [1 ]
Werther, M. [2 ]
Mackay, E. B. [3 ]
Spyrakos, E. [1 ]
Hunter, P. [1 ,4 ]
Jones, I. D. [1 ]
机构
[1] Univ Stirling, Sch Nat Sci, Biol & Environm Sci, Stirling, Scotland
[2] Swiss Fed Inst Aquat Sci & Technol, Dept Surface Waters Res & Management, Dubendorf, Switzerland
[3] UK Ctr Ecol & Hydrol, Lancaster Environm Ctr, Lancaster LA1 4AP, England
[4] Univ Stirling, Sch Nat Sci, Scotlands Int Environm Ctr, Stirling, Scotland
基金
英国自然环境研究理事会;
关键词
Algal blooms; Cyanobacteria; Forecasting; Freshwater; Early warning; Machine learning; ARTIFICIAL NEURAL-NETWORK; CLIMATE-CHANGE; CYANOBACTERIAL BLOOMS; WATER-QUALITY; FRESH-WATER; ENVIRONMENTAL-FACTORS; GLOBAL EXPANSION; CHLOROPHYLL-A; LAKE; PREDICTION;
D O I
10.1016/j.jenvman.2024.123478
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Bloom-forming algae present a unique challenge to water managers as they can significantly impair provision of important ecosystem services and cause health risks to humans and animals. Consequently, effective short-term algae forecasts are important as they provide early warnings and enable implementation of mitigation strategies. In this context, machine learning (ML) emerges as a promising forecasting tool. However, the performance of ML models is heavily dependent on the availability of appropriate training data. Consequently, it is essential to determine the volume of data necessary to develop reliable ML forecasts. Understanding this will guide future monitoring strategies, optimize resource allocation, and set realistic expectations for management outcomes. In this study, we used 30 years of fortnightly measurements of 13 different parameters from a lake in the English Lake District (UK) to examine the impact of training data duration on the performance of ML models for forecasting chlorophyll-a two weeks in advance. Once training data availability exceeded four years, a Random Forest model was found to consistently outperform naive benchmarks (mean absolute percentage error 16.4 % lower than the best-performing benchmark). With more than 5 years of training data, model performance generally continued to improve, but with diminishing returns. Furthermore, it was found that equivalent and, in some cases, better performance could be achieved by only using a subset of the most important input features. Additionally, it was found that reducing the sampling frequency had negative impacts on performance, both due to the reduced number of training observations available, and increased forecast horizon. Our findings demonstrate that for lakes ecologically similar to the study site, a consistent and regular sampling programme focused on monitoring a limited number of key parameters can provide sufficient observations for generating short-term algae forecasts after approximately five years of data collection. Importantly, this result provides justification for the initiation of new monitoring programmes for sites where algal blooms are a concern, and suggests that there are likely many pre-existing monitoring datasets which would be suitable for training algae forecast models.
引用
收藏
页数:13
相关论文
共 50 条
  • [41] A Medium and Long-Term Runoff Forecast Method Based on Massive Meteorological Data and Machine Learning Algorithms
    Li, Yujie
    Wang, Dong
    Wei, Jing
    Li, Bo
    Xu, Bin
    Xu, Yueping
    Huang, Huaping
    WATER, 2021, 13 (09)
  • [42] Short Term Electric Load Forecasting Based on Data Transformation and Statistical Machine Learning
    Andriopoulos, Nikos
    Magklaras, Aristeidis
    Birbas, Alexios
    Papalexopoulos, Alex
    Valouxis, Christos
    Daskalaki, Sophia
    Birbas, Michael
    Housos, Efthymios
    Papaioannou, George P.
    APPLIED SCIENCES-BASEL, 2021, 11 (01): : 1 - 22
  • [43] Medium and Long-term Power Load Forecasting based on the Thought of Big Data
    Zheng, Feng Xian
    Ting, Zhang Ting
    Jun, Li Hong
    Bin, Per Zhao
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT, COMPUTER AND SOCIETY, 2016, 37 : 1312 - 1316
  • [44] Long-term Electrical Load Forecasting based on Economic and Demographic Data for Turkey
    Cetinkaya, Nurettin
    14TH IEEE INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND INFORMATICS (CINTI), 2013, : 219 - 223
  • [45] Annual 30 m soybean yield mapping in Brazil using long-term satellite observations, climate data and machine learning
    Song, Xiao-Peng
    Li, Haijun
    Potapov, Peter
    Hansen, Matthew C.
    AGRICULTURAL AND FOREST METEOROLOGY, 2022, 326
  • [46] Long-term forecasting of Internet backbone traffic: Observations and initial models
    Papagiannaki, K
    Taft, N
    Zhang, ZL
    Diot, C
    IEEE INFOCOM 2003: THE CONFERENCE ON COMPUTER COMMUNICATIONS, VOLS 1-3, PROCEEDINGS, 2003, : 1178 - 1188
  • [47] Advanced stacked integration method for forecasting long-term drought severity: CNN with machine learning models
    Elbeltagi, Ahmed
    Srivastava, Aman
    Ehsan, Muhsan
    Sharma, Gitika
    Yu, Jiawen
    Khadke, Leena
    Gautam, Vinay Kumar
    Awad, Ahmed
    Jinsong, Deng
    JOURNAL OF HYDROLOGY-REGIONAL STUDIES, 2024, 53
  • [49] Long-term solar radiation forecasting in India using EMD, EEMD, and advanced machine learning algorithms
    T. RajasundrapandiyanLeebanon
    N. S. Sakthivel Murugan
    K. Kumaresan
    Andrew Jeyabose
    Environmental Monitoring and Assessment, 197 (3)
  • [50] Long-Term Wind Power Forecasting Using Tree-Based Learning Algorithms
    Ahmadi, Amirhossein
    Nabipour, Mojtaba
    Mohammadi-Ivatloo, Behnam
    Amani, Ali Moradi
    Rho, Seungmin
    Piran, Md. Jalil
    IEEE ACCESS, 2020, 8 : 151511 - 151522