Time-Dependent Displacement Analysis of Anchored Slope Subjected to Seismic Loading Considering Nonlinear Mohr-Coulomb Failure Criterion

被引:0
|
作者
Lu, Li [1 ,2 ]
Lin, Yu-Liang [1 ,3 ]
Dias, Daniel [2 ]
机构
[1] Cent South Univ, Sch Civil Engn, 22 South Shaoshan Rd, Changsha 410075, Peoples R China
[2] Univ Grenoble Alpes, Grenoble INP, CNRS, Lab 3SR, Grenoble, France
[3] Cent South Univ, Natl Engn Res Ctr High speed Railway Construct, Changsha, Peoples R China
基金
中国国家自然科学基金;
关键词
Seismic permanent displacement; seismic behaviour; anchored slope; time-dependent yield acceleration; real-time tangential envelope; STABILITY ANALYSIS; PRESSURES; ENVELOPE; FORCE;
D O I
10.1080/13632469.2024.2445107
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A time-dependent yield acceleration is adopted to estimate the seismic permanent displacement of anchored slope by establishing a dynamic failure mechanism and an instant displacement mode. A real-time equivalent tangential strength envelope is adopted to determine the time-dependent yield acceleration while considering a nonlinear failure criterion of slope soil. The recursion formulas of slope and anchor parameters versus seismic displacement are established to decouple the relationship between the time-dependent yield acceleration and the seismic displacement. The result indicates that the anchored slope becomes more vulnerable to earthquake when the nonlinear parameter of soil increases.
引用
收藏
页码:838 / 864
页数:27
相关论文
共 50 条
  • [41] Quasi-static analysis of seismic stability of anchored rock slope based on JRC-JMC failure criterion
    Lin, Yongliang
    Li, Xinxing
    Lin, Yongliang, 1600, Chinese Society of Civil Engineering (47): : 269 - 273
  • [42] One-Dimensional Consolidation Analysis of Unsaturated Soils Subjected to Time-Dependent Loading
    Ho, Liem
    Fatahi, Behzad
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2016, 16 (02)
  • [43] Upper bound analysis of ultimate pullout capacity of shallow 3-D circular plate anchors based on nonlinear Mohr-Coulomb failure criterion非线性Mohr-Coulomb 破坏准则下浅埋三维圆形锚板极限抗拔力上限分析
    Lian-heng Zhao
    Yi-gao Tan
    Shi-hong Hu
    Dong-ping Deng
    Xin-ping Yang
    Journal of Central South University, 2018, 25 : 2272 - 2288
  • [44] Analysis of one-dimensional nonlinear consolidation of soft soil considering time-dependent loading with continuous drainage boundary
    Wu Si-si
    Luo Wen-qiang
    Li Yin-can
    Cui Wei-jian
    Wang Shuo
    ROCK AND SOIL MECHANICS, 2022, 43 (06) : 1503 - 1512
  • [45] Upper bound limit analysis of three-dimensional collapse mechanism of shallow buried soil tunnel under pore pressure based on nonlinear Mohr-Coulomb criterion
    Yu Li
    Lu Cheng
    Duan Ru-yu
    Wang Ming-nian
    ROCK AND SOIL MECHANICS, 2020, 41 (01) : 194 - 204
  • [46] Nonlinear Consolidation Analysis of Natural Structured Clays under Time-Dependent Loading
    Hu, An-Feng
    Xia, Chang-Qing
    Cui, Jun
    Li, Chuan-Xun
    Xie, Kang-He
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2018, 18 (02)
  • [47] Time-dependent reliability analysis of gear transmission system of wind turbine considering dependent failure
    Zhou, Zhigang
    Qin, Datong
    Yang, Jun
    Chen, Huitao
    Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2013, 34 (07): : 1212 - 1219
  • [48] Time-Dependent Reliability Analysis of Composite Repaired Pipes Subjected to Multiple Failure Modes
    Savari, Ardeshir
    Rashed, Gholamreza
    Eskandari, Hadi
    JOURNAL OF FAILURE ANALYSIS AND PREVENTION, 2021, 21 (06) : 2234 - 2246
  • [49] Time-Dependent Reliability Analysis of Composite Repaired Pipes Subjected to Multiple Failure Modes
    Ardeshir Savari
    Gholamreza Rashed
    Hadi Eskandari
    Journal of Failure Analysis and Prevention, 2021, 21 : 2234 - 2246
  • [50] Time-dependent reliability analysis for mechanisms considering the nonlinear contact behavior in joint clearances
    Zhuang, Xinchen
    Yu, Tianxiang
    NONLINEAR DYNAMICS, 2025, : 14497 - 14514