共 50 条
- [44] Develoment of plugging criterion of steam generator tube based on coalescence model of collinear axial through-wall cracks 2000, American Society of Mechanical Engineers (409):
- [45] ANALYSIS OF STEAM GENERATOR TUBE PLUGGING IN A PWR. INFLUENCE IN THE EMERGENCY OPERATING PROCEDURES 22ND INTERNATIONAL CONFERENCE NUCLEAR ENERGY FOR NEW EUROPE, (NENE 2013), 2013,
- [46] MANAGEMENT OF PWR STEAM GENERATOR TUBE PLUGGING AND PRIMARY FLOW-RATE PREDICTIONS PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE (PVP-2011), VOL 7, 2012, : 193 - 200
- [48] Local wafer temperature non-uniformity correction with laser irradiation 2015 26TH ANNUAL SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE (ASMC), 2015, : 179 - 184