Simulation of time-dependent response of jointed rock masses using the 3D DEM-DFN modeling approach

被引:0
|
作者
Wang, Mingzheng [1 ,2 ]
Cai, Ming [1 ,2 ,3 ]
机构
[1] Northeastern Univ, Minist Educ Safe Min Deep Met Mines, Key Lab, Shenyang, Peoples R China
[2] Laurentian Univ, MIRARCO Min Innovat, Sudbury, ON, Canada
[3] Laurentian Univ, Sch Engn & Comp Sci, Sudbury, ON, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Time-dependent deformation; Creep model; Jointed rock mass; Discrete fracture network; Tunneling; STRENGTH; BEHAVIOR; STRESS;
D O I
10.1016/j.ijrmms.2025.106062
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Investigating the mechanical response of jointed rock mass, especially its potential changes over time, is vital for the design of geotechnical structures with a long service lifetime. This article studies time-dependent deformations of jointed rock masses based on the 3D distinct element method (DEM) incorporating discrete fracture networks (DFN). A new 3D creep model for jointed rock masses is developed, emphasizing the structural failure due to the creep sliding of joints while considering the long-term strength and the time-to-failure phenomenon of intact rocks. The creep sliding constitutive model of joints is developed based on Barton's nonlinear strength criterion. First, the model implementation, parameter calibration, and model validations are introduced. Then, a case study of the TAS08 tunnel in A<spacing diaeresis>spo<spacing diaeresis> Hard Rock Laboratory (HRL) in Sweden is presented. A DFN model using field mapping data is constructed using Mofrac. The time-dependent response of the TAS08 tunnel is analyzed using the proposed creep model for jointed rock masses. Based on the simulation results, it show that the proposed approach can effectively simulate the time-dependent deformation of jointed rock masses. The DEM-DFN simulation approach provides a valuable tool for analyzing time-dependent responses of excavations and managing hazards associated with structurally controlled failures.
引用
收藏
页数:12
相关论文
共 50 条
  • [41] Modeling time-dependent mechanical behavior of hard rock considering excavation-induced damage and complex 3D stress states
    Yu, Peiyang
    Ding, Xiuli
    Pan, Peng-Zhi
    Miao, Shuting
    Wang, Zhaofeng
    Huang, Shuling
    JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2024, 16 (10) : 4046 - 4065
  • [42] STABILITY ANALYSIS OF JOINTED ROCK TUNNEL USING GEOSMA-3D MODELING
    Song, Tianyu
    Wang, Shuhong
    Rao, Wenjie
    Liang, Yan
    NEW DEVELOPMENT IN ROCK MECHANICS AND ENGINEERING (NDRM2012), 2013, : 224 - 228
  • [43] Experimental study of uniaxial compressive mechanical properties of rough jointed rock masses based on 3D printing
    Yuan, Pu
    Li, Aobo
    Chen, Changning
    Lu, Xuefeng
    APPLIED RHEOLOGY, 2023, 33 (01)
  • [44] Statistical simulation of 3D blocky structure - a guide for tunnel design in jointed rock.
    Jakubowski, J
    ROCK MECHANICS: A CHALLENGE FOR SOCIETY, 2001, : 351 - 355
  • [45] Time-dependent buildability evaluation of 3D printed concrete: experimental validation and numerical simulation
    Shahzad, Qamar
    Akbar, Muhammad
    Alzara, Majed
    Yosri, Ahmed M.
    Abbas, Nadeem
    Zaghloul, Yasser R.
    JOURNAL OF SUSTAINABLE CEMENT-BASED MATERIALS, 2025, 14 (03) : 431 - 445
  • [46] Time-dependent 3D visualisation of solar and heliospheric data
    Mueller, D.
    Nicula, B.
    Felix, S.
    Verstringe, F.
    Bourgoignie, B.
    Csillaghy, A.
    Berghmans, D.
    Jiggens, P.
    Garcia-Ortiz, J. P.
    Ireland, J.
    Zahniy, S.
    Fleck, B.
    ASTRONOMY & ASTROPHYSICS, 2017, 606
  • [47] A 3D time-dependent backward erosion piping model
    Pol, Johannes C.
    Noordam, Aron
    Kanning, Willem
    COMPUTERS AND GEOTECHNICS, 2024, 167
  • [48] AN APPROACH FOR TIME-DEPENDENT BONE MODELING AND REMODELING - APPLICATION - A PRELIMINARY REMODELING SIMULATION
    BEAUPRE, GS
    ORR, TE
    CARTER, DR
    JOURNAL OF ORTHOPAEDIC RESEARCH, 1990, 8 (05) : 662 - 670
  • [49] Simulation of Asymmetric Destabilization of Mine-void Rock Masses Using a Large 3D Physical Model
    Lai, X. P.
    Shan, P. F.
    Cao, J. T.
    Cui, F.
    Sun, H.
    ROCK MECHANICS AND ROCK ENGINEERING, 2016, 49 (02) : 487 - 502
  • [50] Modeling screening efficiency with vibrational parameters based on DEM 3D simulation
    Chen Y.
    Tong X.
    Mining Science and Technology, 2010, 20 (04): : 615 - 620