Impact of Project Managers' Contingent Reward Leadership Style on Performance of BIM Construction Projects

被引:0
|
作者
Vu, Thi Kim Dung [1 ,2 ]
Hsieh, Shang-Hsien [1 ]
机构
[1] Natl Taiwan Univ, Dept Civil Engn, 1,Sec 4,Roosevelt Rd, Taipei 106319, Taiwan
[2] Hanoi Univ Civil Engn, 55 Giai Phong St, Hanoi 11616, Vietnam
关键词
Building information modeling (BIM); Contingent reward; BIM maturity; Information management; Company control; Project coordination; Project performance; Project complexity; Project ownership; Country context; TRANSFORMATIONAL LEADERSHIP; TRANSACTIONAL LEADERSHIP; CONTROL MODES; SUCCESS; COORDINATION; COMMITMENT; GOVERNANCE; DELIVERY;
D O I
10.1061/JMENEA.MEENG-6557
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
As the construction industry increasingly adopts building information modeling (BIM), identifying effective leadership styles for BIM project management is crucial for project success. Although traditional leadership styles suit conventional construction projects, their applicability to the BIM context remains underexplored. This study partly addresses this gap by investigating how contingent reward leadership style impacts BIM project performance. Utilizing data from a survey of 224 BIM projects and covariance-based structural equation modeling (CB-SEM), this study reveals that the project managers' contingent reward leadership style significantly enhances BIM project performance, fully mediated by BIM project coordination effectiveness. The study also highlights the confounding impacts of company control over projects and the project's BIM maturity in information management (IM). Although these factors do not alter the mediation relationship, they contribute to project performance: company behavior control enhances project quality, whereas higher BIM maturity improves project coordination, schedule, budget, and quality performance. The study also reveals that although the contingent reward leadership style consistently benefits BIM projects of varying complexity and countries (Taiwan and Vietnam), its influence on project quality differs between public and private BIM projects. This study enriches the current body of knowledge on BIM and project management. First, it empirically proves the contingent reward leadership style's effectiveness in BIM project contexts. Second, it bridges two critical but rarely linked concepts: contingent reward leadership and project coordination. Finally, it extends the contingency theory of BIM project management by investigating the underexplored contextual factors, such as company control over projects and the project's BIM maturity in IM, besides project complexity, project ownership, and country context. This study advances the understanding of leadership dynamics in BIM environments and offers practical insights for BIM practitioners, enabling them to tailor leadership strategies to optimize BIM project outcomes under varying contextual influences.
引用
收藏
页数:17
相关论文
共 50 条
  • [31] Effects of construction project managers' goal orientation on project performance
    Zhang, Qi
    Hao, Shengyue
    Guo, Jienan
    Tang, Boju
    SOCIAL BEHAVIOR AND PERSONALITY, 2022, 50 (06):
  • [32] Assessing the factors of transactional leadership style for construction projects: a case of Nigerian construction industry
    Olasunkanmi, Femi-favour Olabode
    Ikediashi, Dubem Isaac
    Ajiero, Ikenna Reginald
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2024, 22 (05) : 1637 - 1654
  • [33] Harnessing informal knowledge leadership in construction projects to boost project performance: the social exchange perspective
    Xiao, Liang
    Shen, Geoffrey Qiping
    Zheng, Xian
    Ma, Guofeng
    Jia, Jianyao
    Zhang, Yuanyuan
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2025,
  • [34] Outsourcing Projects Success: The Role of Competence and Leadership of the Vendors and Clients Project Managers
    Zainuddin, Eruani
    Bassellier, Genevieve
    Benbasat, Izak
    SIGMIS CPR '10: PROCEEDINGS OF THE 2010 ACM SIGMIS COMPUTER PERSONNEL RESEARCH CONFERENCE, 2010, : 83 - 87
  • [35] Can Project managers' emotional intelligence contribute to the success of construction projects?
    Hanafi, Abdul Ghafur
    Nawi, Mohd Nasrun Mohd
    Test Engineering and Management, 2019, 81 (11-12): : 839 - 849
  • [36] A FRAMEWORK FOR EVALUATING PROJECT MANAGERS' PERFORMANCE-IDENTIFICATION AND ANALYSIS OF KPIS IN SUBWAY CONSTRUCTION PROJECTS IN TEHRAN
    Ghanbaripour, Amir Naser
    Ghoddousi, Parviz
    Yousefi, Ariyan
    TURKISH ONLINE JOURNAL OF DESIGN ART AND COMMUNICATION, 2016, 6 : 1656 - 1664
  • [37] STRATEGIES FOR MINIMIZING INFORMATION ASYMMETRIES IN CONSTRUCTION PROJECTS: PROJECT MANAGERS' PERCEPTIONS
    Ceric, Anita
    JOURNAL OF BUSINESS ECONOMICS AND MANAGEMENT, 2014, 15 (03) : 424 - 440
  • [38] Machine learning for the identification of competent project managers for construction projects in Nepal
    Karki, Samrakshya
    Hadikusumo, Bonaventura
    CONSTRUCTION INNOVATION-ENGLAND, 2023, 23 (01): : 1 - 18
  • [39] Factors and procedures used in matching project managers to construction projects in Bangkok
    Ogunlana, Stephen
    Siddiqui, Zafaar
    Yisa, Silas
    Olomolaiye, Paul
    International Journal of Project Management, 2002, 20 (05) : 385 - 400
  • [40] Female Leadership in Software Projects-A Preliminary Result on Leadership Style and Project Context Factors
    Anh Nguyen-Duc
    Khodambashi, Soudabeh
    Gulla, Jon Atle
    Krogstie, John
    Abrahamsson, Pekka
    TOWARDS A SYNERGISTIC COMBINATION OF RESEARCH AND PRACTICE IN SOFTWARE ENGINEERING, 2018, 733 : 149 - 163