Adaptive Operating Rules for Flood Control of a Multi-Purpose Reservoir

被引:0
|
作者
Drobot, Radu [1 ]
Draghia, Aurelian Florentin [2 ]
Dinu, Cristian [3 ]
Sirbu, Nicolai [1 ]
Chendes, Viorel [4 ]
Mazilu, Petrisor [5 ]
机构
[1] Tech Univ Civil Engn, Dept Hydrotech Engn, Bucharest 020396, Romania
[2] Roua Soft SRL, Bucharest 040271, Romania
[3] Urban Arte Studio, Bucharest 021177, Romania
[4] Natl Inst Hydrol & Water Management, Bucharest 013686, Romania
[5] Natl Adm Romanian Waters, Bucharest 010031, Romania
关键词
critical design flood; hydraulic modelling; flood attenuation; mechanical outlets; operating rules; RETURN PERIODS; DESIGN; MANAGEMENT; RISK; DAM; MODEL; OPTIMIZATION; SYSTEMS; PEAK;
D O I
10.3390/hydrology11090147
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
Almost all multipurpose reservoirs in Romania were put into operation 30-50 years ago or even earlier. Meanwhile, a large volume of hydrologic data has been collected, and the initial design flood should be reconsidered. Consequently, the operating rules of flow control structures (bottom gates and weir gates) should be re-examined, mainly for medium and low-frequency floods. The design flood is not unique, being characterized by different shapes and time to peak, which has consequences for flood mitigation rules. Identifying the critical design flood is an important preliminary step, although it is usually neglected in flood management. Simulating the operation of the St & acirc;nca-Costesti reservoir on the Prut River, it was found that the design flood corresponding to the maximum value of the compactness coefficient is the most difficult to mitigate considering the specific conditions of the dam and the reservoir: the prescribed conservation level in the reservoir, and the design flood volume of medium and rare floods that far exceeds the flood control volume. These conditions can jeopardize both dam safety and downstream flood protection. The main steps of the proposed approach are as follows: (1) developing the hydraulic model; (2) statistical processing of the registered floods and defining critical design floods for different AEPs (Annual Exceedance Probabilities); (3) deriving optimal operation rules based on a simulation-optimization model; (4) implementing real-time adaptive operation of the mechanical outlets; and (5) critically assessing the operating rules after the event. Based on the hydrological forecast, if necessary, new outlets are put into operation while keeping the ones already activated. Based on the hydrological forecast and properly operated, the safety of the St & acirc;nca-Costesti dam is guaranteed even in the event of a 0.1% CC (Climate Change) flood. However, for floods greater than 1% magnitude, the carrying capacity of the downstream riverbed is exceeded. The main gaps addressed in this paper are the following: (1) the establishment of critical design floods, and (2) the adaptive operating rules of outlet devices aimed at optimizing flood control results, using short-term flood forecasts.
引用
收藏
页数:40
相关论文
共 50 条
  • [31] Assessing flood risk using reservoir flood control rules
    Fu, Xiang
    Mei, Yadong
    Xiao, Zhihuai
    JOURNAL OF EARTH SCIENCE, 2016, 27 (01) : 68 - 73
  • [32] Assessing Flood Risk Using Reservoir Flood Control Rules
    Xiang Fu
    Yadong Mei
    Zhihuai Xiao
    Journal of Earth Science, 2016, 27 (01) : 68 - 73
  • [33] Multi-purpose laser diode control with LabVIEW
    Mittendorfer, R
    Costa, A
    Weiss, H
    ICEMI '97 - CONFERENCE PROCEEDINGS: THIRD INTERNATIONAL CONFERENCE ON ELECTRONIC MEASUREMENT & INSTRUMENTS, 1997, : 22 - 29
  • [34] Assessing flood risk using reservoir flood control rules
    Xiang Fu
    Yadong Mei
    Zhihuai Xiao
    Journal of Earth Science, 2016, 27 : 68 - 73
  • [35] Optimizing the Management Strategies of a Multi-Purpose Multi-Reservoir System in Vietnam
    Chou, Frederick N. -F.
    Nguyen Thi Thuy Linh
    Wu, Chia-Wen
    WATER, 2020, 12 (04)
  • [36] Optimizing the management strategies of a multi-purpose multi-reservoir system in Vietnam
    Chou F.N.-F.
    Linh N.T.T.
    Wu C.-W.
    Water (Switzerland), 2020, 12 (04):
  • [37] Scheduling of hydropower station with multi-purpose reservoir for timed power tariff
    Ma, Guangwen
    Wang, Li
    Guo, Xiaming
    Wang, Liming
    Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2002, (03):
  • [38] Model-Based Operation of Multi-Purpose River and Reservoir Systems
    Roetz, Alexander
    Theobald, Stephan
    WATER RESOURCES MANAGEMENT, 2019, 33 (15) : 4969 - 4982
  • [39] Optimizing Multi-purpose Reservoir Operation Using Particle Swarm Intelligence
    Abdallah, Mohammed
    Stamm, Juergen
    HYDRODYNAMIC AND MASS TRANSPORT AT FRESHWATER AQUATIC INTERFACES, 2016, : 209 - 220
  • [40] ANALYSIS OF TIME OSCILLATIONS OF WATER ON LAKE MODRIC AS A MULTI-PURPOSE RESERVOIR
    Nedim, Suljic
    Omer, Kovcic
    ARCHIVES FOR TECHNICAL SCIENCES, 2018, (18): : 31 - 40