Joint Optimization of Preventive Replacement and Spare Part Ordering for Single-Unit Systems With Mixed Inspections

被引:0
|
作者
Liu, Yongchao [1 ]
Wang, Guanjun [1 ]
Liu, Peng [1 ]
机构
[1] Southeast Univ, Sch Math, Nanjing, Peoples R China
关键词
average availability; average cost rate; mean time to failure; preventive replacement; spare part ordering; INVENTORY SYSTEM; POLICIES; TIME; MODEL;
D O I
10.1002/qre.3701
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper introduces a unified policy for preventive replacement and spare parts ordering for systems whose degradation follows a gamma process. It considers N$N$ types of orders, each with variable lead times, and employs a combined inspection approach that integrates sequential and opportunistic inspections to monitor the system condition. The proposed policy coordinates the scheduling of spare parts orders, preventive replacements, and inspections based on the current state of the system. To assess its performance, the renewal reward theorem is used to calculate the average cost rate, the average availability, and the mean time to the first failure. The objective is to minimize the average cost rate, achieved through a grid search algorithm that identifies the optimal inspection and ordering policy. The effectiveness of the proposed policy is further validated by comparing its performance with three other policies in existing research works.
引用
收藏
页码:919 / 932
页数:14
相关论文
共 35 条
  • [1] Joint optimization of inspection-based and age-based preventive maintenance and spare ordering policies for single-unit systems
    Ma Weining
    Zhao Fei
    Li Xin
    Hu Qiwei
    Shang Bingcong
    JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2022, 33 (05) : 1268 - 1280
  • [2] Joint optimization of inspection-based and age-based preventive maintenance and spare ordering policies for single-unit systems
    MA Weining
    ZHAO Fei
    LI Xin
    HU Qiwei
    SHANG Bingcong
    JournalofSystemsEngineeringandElectronics, 2022, 33 (05) : 1268 - 1280
  • [3] Joint Optimization of Spare Ordering and Preventive Replacement Policy Based on RUL
    Zhao, Fei
    Zhang, Yu
    Liu, Xuejuan
    2019 PROGNOSTICS AND SYSTEM HEALTH MANAGEMENT CONFERENCE (PHM-QINGDAO), 2019,
  • [4] Joint optimization of spare parts ordering and age-based preventive replacement
    Panagiotidou, Sofia
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (20) : 6283 - 6299
  • [5] A fixed interval ordering policy for joint optimization of age replacement and spare part provisioning
    Kabir, ABMZ
    Farrash, SHA
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1997, 28 (12) : 1299 - 1309
  • [6] Joint Optimization of Replacement and Spare Parts Ordering with Dual Sourcing
    Ye H.
    Su H.
    Zheng M.
    Xia T.
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2022, 56 (10): : 1359 - 1367
  • [7] Joint optimization of preventive replacement and periodic review spare part provisioning policy with used items
    Zhang, J
    Tian, ZG
    Li, XH
    Zuo, MJ
    PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT IN THE GLOBAL ECONOMY, 2005, : 878 - 882
  • [8] Joint optimization of preventive maintenance and inventory policies for multi-unit systems subject to deteriorating spare part inventory
    Jiang, Yunpeng
    Chen, Maoyin
    Zhou, Donghua
    JOURNAL OF MANUFACTURING SYSTEMS, 2015, 35 : 191 - 205
  • [9] A joint optimal policy of block preventive replacement and spare part inventory
    Yang R.
    Kang J.
    International Journal of System Assurance Engineering and Management, 2017, 8 (4) : 740 - 746
  • [10] Joint Optimization of Preventive Maintenance and Spare Parts Ordering Considering Imperfect Detection
    He, Yuanchang
    Gao, Zhenhua
    SYSTEMS, 2023, 11 (09):