Establishment and validation of a prognostic risk early-warning model for retinoblastoma based on XGBoost

被引:0
|
作者
Wang, Feng [1 ]
Wang, Jian [2 ]
机构
[1] Changzhi Peoples Hosp, Dept Ophthalmol, Changzhi 046000, Shanxi, Peoples R China
[2] Shanxi Prov Peoples Hosp, Dept Radiol, Taiyuan 030012, Shanxi, Peoples R China
来源
AMERICAN JOURNAL OF CANCER RESEARCH | 2025年 / 15卷 / 01期
关键词
Retinoblastoma; XGBoost; prognostic evaluation; cox regression; risk early-warning model;
D O I
10.62347/WHUQ1208
中图分类号
R73 [肿瘤学];
学科分类号
100214 ;
摘要
Retinoblastoma (RB) is the most common intraocular malignancy in children, and early detection and treatment are crucial for improving patient outcomes. Conventional treatments, such as enucleation and radiotherapy, have limitations in fully addressing prognosis. This study aimed to establish and validate an early-warning prognostic model for RB based on the XGBoost algorithm to improve the prediction accuracy of the 5-year survival rate in children. A retrospective analysis was conducted on 320 children with RB treated at Changzhi People's Hospital between February 2012 and April 2019. The patients were randomly divided into a training group (n=224) and a validation group (n=96). Clinical data, including age, gender, tumor characteristics, and tumor marker levels, were collected. Prognostic factors were analyzed using XGBoost and Cox regression models, and model performance was evaluated using various statistical methods. No significant differences were observed in baseline data between the two sets (P>0.05). Cox regression analysis identified tumor diameter (P=0.032), IIRC stage (P<0.001), and NSE (P=0.016) as independent prognostic factors. The XGBoost model achieved an area under the curve (AUC) of 0.951 in the training group, significantly higher than the Cox model (P=0.001), while in the validation group, the XGBoost model's AUC was 0.902, with no significant difference compared to the Cox model (P=0.117). The XGBoost model demonstrated high accuracy and clinical utility in predicting the 5-year survival of children with RB. Decision curve analysis (DCA) and calibration curves further confirmed that the XGBoost model offers higher clinical net benefits and superior calibration ability across various thresholds.
引用
收藏
页码:99 / 112
页数:14
相关论文
共 50 条
  • [41] The E-commerce Risk Early-Warning Model Based on the Unascertained C-means Clustering
    Ma Lihua
    Ma Fengyun
    Guo Haiyan
    CEIS 2011, 2011, 15
  • [42] Novel approaches for risk evaluation and early-warning in finance based on a new understanding of risk
    Huang, Funing
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & GLOBAL E-BUSINESS, VOLS I AND II, 2009, : 1197 - 1202
  • [43] Risk Assessment and Early-Warning of Venture Capital Project
    Gao Weiyi
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & GLOBAL E-BUSINESS, VOLS I AND II, 2009, : 993 - 997
  • [44] Research on Early-warning and Countermeasures of Financial Risk in Universities
    Pan, Feng
    Pan, Hui
    Ou, Ruixiang
    Huang, Yao
    PROCEEDINGS OF THE 2017 3RD INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING (ESSAEME 2017), 2017, 119 : 860 - 864
  • [45] An Early-Warning Model For Supply Chain Risk Based On The Balanced Scoring Card And BP Neural Networks
    Wang Qinghua
    Xiong Xiaozhong
    Tian Wenhao
    He Liang
    2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 997 - 1000
  • [46] Early-Warning Signals and Risk-Shifting Incentives
    Laux, Volker
    Zheng, Ronghuo
    ACCOUNTING REVIEW, 2023, 98 (04): : 273 - 288
  • [47] Research on the Early-warning for Construction Project Cost Risk
    Liu Zi-mei
    Xie Ke-fan
    2013 FOURTH INTERNATIONAL CONFERENCE ON DIGITAL MANUFACTURING AND AUTOMATION (ICDMA), 2013, : 1127 - 1129
  • [48] The discussion on risk early-warning and prevention of supply chain
    Lian, Ge Guo
    Hu, Li
    ICPOM2008: PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE OF PRODUCTION AND OPERATION MANAGEMENT, VOLUMES 1-3, 2008, : 494 - 498
  • [49] The financial risk index system and early-warning research
    Zhu Honghan
    Liu Xiangyun
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON MECHATRONICS, ROBOTICS AND AUTOMATION (ICMRA 2015), 2015, 15 : 443 - 447
  • [50] A New Risk-Based Early-Warning Method for Ship Collision Avoidance
    Chen, Yingfan
    Xie, Cheng
    Chen, Shuzhe
    Huang, Liwen
    IEEE ACCESS, 2021, 9 : 108236 - 108248