An efficient uncertain chance constrained geometric programming model based on value-at-risk for truss structure optimization problems

被引:0
|
作者
Chen, Jie [1 ]
Li, Haoxuan [1 ]
Yang, Xiangfeng [1 ]
机构
[1] Univ Int Business & Econ, Sch Informat Technol & Management, Beijing 100029, Peoples R China
基金
中国国家自然科学基金;
关键词
Uncertainty theory; Chance constraints; Geometric programming; Value-at-risk; Two-bar truss;
D O I
10.1016/j.cam.2024.116347
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
Uncertain geometric programming is a type of geometric programming involving uncertain variables. As described in the literature, the uncertain geometric programming model based on expected value cannot reflect the risk preference of decision-makers. It motivates us to establish an uncertain geometric programming model based on value-at-risk to describe the risk level that managers can tolerate. Firstly, we propose the uncertain geometric programming model based on value-at-risk. Then, according to the operational law in uncertainty theory, this model is transformed into a crisp and equivalent form. Three numerical examples are used to verify the model's efficacy, and the paper emphasizes the influence of confidence level in the objective function and the constraints. In addition, the paper discusses the expected value model under an uncertain environment and presents the difference between expected value and value-at-risk. Finally, we apply the model to the problem of a two-bar truss, and the optimal solution can be obtained within the risk level that the structural designer can accept.
引用
收藏
页数:15
相关论文
共 34 条
  • [21] Study on evaluation optimization model of diesel locomotive emission reduction technology based on stochastic chance-constrained programming
    Hu, Hui
    Li, Ke-Ping
    Xu, Xiao-Ming
    Tiedao Xuebao/Journal of the China Railway Society, 2012, 34 (11): : 10 - 15
  • [22] A tri-level programming model based on Conditional Value-at-Risk for three-stage supply chain management
    Xu, Xinsheng
    Meng, Zhiqing
    Shen, Rui
    COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 66 (02) : 470 - 475
  • [23] Exploring the quantitive relationship between economic benefit and environmental constraint using an inexact chance-constrained fuzzy programming based industrial structure optimization model
    Rao Y.
    Zhou M.
    Cao C.
    Tan S.
    Song Y.
    Zhang Z.
    Dai D.
    Ou G.
    Zhang L.
    Nie X.
    Deng A.
    Cairen Z.
    Quality & Quantity, 2019, 53 (4) : 2199 - 2220
  • [24] Solving fuzzy chance-constrained programming with ant colony optimization-based algorithms and application to fuzzy inventory model
    Zhu, Yuanguo
    COMPUTATIONAL INTELLIGENCE, PT 2, PROCEEDINGS, 2006, 4114 : 977 - 983
  • [25] Portfolio Value-at-Risk and expected-shortfall using an efficient simulation approach based on Gaussian Mixture Model
    Seyfi, Seyed Mohammad Sina
    Sharifi, Azin
    Arian, Hamidreza
    Mathematics and Computers in Simulation, 2021, 190 : 1056 - 1079
  • [26] Portfolio Value-at-Risk and expected-shortfall using an efficient simulation approach based on Gaussian Mixture Model
    Seyfi, Seyed Mohammad Sina
    Sharifi, Azin
    Arian, Hamidreza
    MATHEMATICS AND COMPUTERS IN SIMULATION, 2021, 190 : 1056 - 1079
  • [27] Two-stage chance-constrained programming based on Gaussian mixture model and piecewise linear decision rule for refinery optimization
    Yang, Yu
    COMPUTERS & CHEMICAL ENGINEERING, 2024, 184
  • [28] Stochastic optimization model for the short-term joint operation of photovoltaic power and hydropower plants based on chance-constrained programming
    Yuan, Wenlin
    Wang, Xinqi
    Su, Chengguo
    Cheng, Chuntian
    Liu, Zhe
    Wu, Zening
    ENERGY, 2021, 222
  • [29] An optimization model for regional micro-grid system management based on hybrid inexact stochastic-fuzzy chance-constrained programming
    Ji, L.
    Niu, D. X.
    Xu, M.
    Huang, G. H.
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2015, 64 : 1025 - 1039
  • [30] Multi-Objective Stochastic Synchronous Timetable Optimization Model Based on a Chance-Constrained Programming Method Combined with Augmented Epsilon Constraint Algorithm
    Yuan, Yu
    Wang, Pengcheng
    Wang, Minghui
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022