A risk-based multi-criteria maintenance planning of distribution feeders

被引:0
|
作者
Popovic, Zeljko N.
Krsman, Vladan D. [1 ,2 ]
Rakic, Marko P.
Airiman, Matias E. [3 ]
机构
[1] Univ Novi Sad, Fac Tech Sci, Trg Dositeja Obradov 6, Novi Sad 21000, Serbia
[2] Schneider Elect LLC, Industrijska 3G, Novi Sad 21000, Serbia
[3] Ellevio, Valhallavagen 203, S-11553 Stockholm, Sweden
关键词
Distribution network; Reliability; Maintenance planning; Uncertainty; Multi-criteria decision making; Risk assessment; DISTRIBUTION NETWORKS; RELIABILITY; INTERVAL;
D O I
10.1016/j.ijepes.2024.110379
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper proposes a risk-based multi-criteria approach for maintenance planning of distribution feeders that uses Outage Management System (OMS) historical data to obtain a minimum-risk maintenance plan. It considers simultaneously system-oriented and local-oriented reliability indices per interruption causes to ensure the necessary granularity of the analysis and the consistency (fairness) of reliability across the system. Uncertainty in reliability indices per interruption causes is described by intervals obtained using the bootstrap method and the historical OMS data. Using the interval extension of the TOPSIS technique and the interval-valued reliability indices per interruption causes, the ranking of interruption causes by the reliability indices is performed according to a decision maker's risk preferences and preferences regarding consistency (fairness) of reliability across the system. The ranking list is further assessed using the Pareto principle to obtain a list of interruption causes, i.e., pairs (feeder, interruption cause), responsible for most power interruptions. Then, maintenance actions are defined that reduce the influence of those causes on power interruptions. For a maintenance action, intervals of cost and maintenance effectiveness factors are defined to account for the uncertainty about cost and benefit estimation. Next, using the interval extension of the TOPSIS technique, maintenance actions, i.e., pairs (feeder, maintenance action), are ranked according to a decision maker's risk preference, reliability balancing preference, and the trade-off preference between benefit and cost. The ranking list is then iteratively used within the proposed procedure to obtain an initial minimum-risk maintenance plan used as the initial solution in the proposed multi-criteria simulated annealing (MCSA) algorithm. It generates a set of Pareto-optimal maintenance plans ranked using the interval extension of TOPSIS to obtain a minimum-risk maintenance plan according to the adopted decision maker's risk preference, reliability balancing preference, and the trade-off preference between benefit and cost. The effectiveness of the proposed approach is illustrated through case studies of the real-life power distribution company that supplies about 1 million customers through around 3000 medium-voltage feeders.
引用
收藏
页数:14
相关论文
共 50 条
  • [31] Maintenance applications of multi-criteria optimization: A review
    Syan, Chanan S.
    Ramsoobag, Geeta
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2019, 190
  • [32] A multi-criteria model for maintenance job scheduling
    Ogunwolu, Oladimeji F.
    Oke, Sunday A.
    Popoola, Oluwatoyin P.
    MAEJO INTERNATIONAL JOURNAL OF SCIENCE AND TECHNOLOGY, 2008, 2 (01) : 1 - 12
  • [33] Framework for Risk-based Planning of Operation and Maintenance for Offshore Wind Turbines
    Sorensen, John Dalsgaard
    WIND ENERGY, 2009, 12 (05) : 493 - 506
  • [34] Risk-Based Maintenance Planning for Deteriorating Pressure Vessels With Multiple Defects
    Haladuick, Shane
    Dann, Markus R.
    JOURNAL OF PRESSURE VESSEL TECHNOLOGY-TRANSACTIONS OF THE ASME, 2017, 139 (04):
  • [35] Sensitivity of Risk-Based Maintenance Planning of Offshore Wind Turbine Farms
    Ambuhl, Simon
    Sorensen, John Dalsgaard
    ENERGIES, 2017, 10 (04):
  • [36] Multi-Criteria Analysis for decision making applied to active distribution network planning
    Cella, Gianni
    Chowdhury, Nayeem
    Pilo, Fabrizio
    Soma, Gian Giuseppe
    Troncia, Matteo
    Gianinoni, Iva Maria
    ELECTRIC POWER SYSTEMS RESEARCH, 2018, 164 : 103 - 111
  • [37] Risk-based maintenance backlog
    Rodseth, Harald
    SAFETY AND RELIABILITY - SAFE SOCIETIES IN A CHANGING WORLD, 2018, : 645 - 651
  • [38] Integration of Distributed Generations in Smart Distribution Networks Using Multi-Criteria Based Sustainable Planning Approach
    Khalil, Muhammad Waqas
    Altamimi, Abdullah
    Kazmi, Syed Ali Abbas
    Khan, Zafar A.
    Shin, Dong Ryeol
    SUSTAINABILITY, 2023, 15 (01)
  • [39] Multi-Criteria Rank-Based Planning of the Distribution System with HOMER Integrated Weighted Sum Model
    Soni, Yuvraj Praveen
    Fernandez, Eugene
    2022 IEEE 10TH POWER INDIA INTERNATIONAL CONFERENCE, PIICON, 2022,
  • [40] Multi-Criteria Distribution Network Selection
    Elmokrini, A.
    Benabbou, L.
    Berrado, A.
    2015 10TH INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS: THEORIES AND APPLICATIONS (SITA), 2015,