Understanding Critical Delay Causative Factors and Their Mitigation Measures in Burundi Communal Construction Projects: A Factor Analysis and Structural Equation Modeling Approach

被引:0
|
作者
Irankunda, Georges [1 ]
Zhang, Wei [1 ]
Abdullahi, Usman Isah [1 ]
Fernand, Muhirwa [2 ]
David, Byiringiro [3 ]
Jean-Petit, Sinamenye [4 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Civil & Hydraul Engn, Wuhan 430074, Peoples R China
[2] Wuhan Univ, Sch Civil Engn, Hubei Key Lab Geotech & Struct Safety, Wuhan 430072, Peoples R China
[3] Wuhan Univ Technol, Sch Civil Engn & Architecture, Wuhan 430070, Peoples R China
[4] Univ Burundi, Dept Econ & Management, UNESCO Ave 2,POB 1550, Bujumbura, Burundi
关键词
relative importance index; factor analysis; structural equation modeling; causes of delay; communal construction projects; fond national d'investissement communal (FONIC); ROAD;
D O I
10.3390/buildings15030473
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The execution of a construction project faces many potentials challenges, and delays are one of them. Communal construction projects in Burundi (CCP-Burundi projects) were considered as one field that could generate a Burundi government development plan. However, according to the frequency of delays encountered by these projects, at a rate of 70% on average every year, the government's target seems far from being achieved. As no scientific study exists on how to avoid CCP delays, this paper aims to identify and analyze factors that cause delays in CCP-Burundi and provide related measures to overcome them. Based on a list of fifty delay factors gathered from the National Communal Investment Fund institution FONIC (Fond National d'Investissement Communal), communal annual reports, and the literature, a questionnaire survey was developed and dispersed to CCP stakeholders to collect data about critical factors. The top fifteen factors were identified using a relative importance index and a factor analysis was performed. "Weather conditions" was the top-ranked factor, while "Claims" was the lowest ranked. A structural equation modeling approach was adopted to evaluate influences at the relationship level among delay factor groups. A standardized calculation revealed that Factors During Awarding of Bid (FDABs) positively influence Factors After the Award of Bid (FAABs). The findings were implemented in case studies to assess their efficacy. This paper's findings could assist upcoming construction practitioners and future researchers aiming to explore construction-related project delays, providing a fundamental understanding of the significant delays encountered in the Burundi construction industry.
引用
收藏
页数:29
相关论文
共 50 条
  • [1] Development of delay mitigation measures in construction projects: a combined interpretative structural modeling and MICMAC analysis approach
    Arantes, Amilcar
    Ferreira, Luis Miguel D. F.
    PRODUCTION PLANNING & CONTROL, 2024, 35 (10) : 1164 - 1179
  • [2] Critical delay factors in power transmission projects: a structural equation modeling approach
    Pall, Goutom K.
    Bridge, Adrian J.
    Washington, Simon
    Gray, Jason
    Skitmore, Martin
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (06) : 1158 - 1170
  • [3] Analysis of causes of delay in Indian construction projects and mitigation measures
    Prasad, K. V.
    Vasugi, V.
    Venkatesan, R.
    Bhat, Nikhil
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2019, 24 (01) : 58 - 78
  • [4] Critical design factors for minimising waste in construction projects: A structural equation modelling approach
    Ajayi, Saheed O.
    Oyedele, Lukumon O.
    RESOURCES CONSERVATION AND RECYCLING, 2018, 137 : 302 - 313
  • [5] Analysis of Key Factors of Cost Overrun in Construction Projects Based on Structural Equation Modeling
    Dong, Sizi
    Ahmed, Mukhtar
    Chatpattananan, Vuttichai
    SUSTAINABILITY, 2025, 17 (05)
  • [6] Structural equation model for investigating factors affecting delay in Indian construction projects
    Doloi, Hemanta
    Sawhney, Anil
    Iyer, K. C.
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2012, 30 (10) : 869 - 884
  • [7] Analysis and prioritisation of critical delay factors in construction projects: A Colombian case
    Ovalle, Oscar Rubiano
    Correa-Cepeda, Daniela
    Estrada-Cifuentes, Juan P.
    Mopan, Yesid Anacona
    ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2024, 16 (01): : 237 - 250
  • [8] Analysis of interaction among the factors affecting delay in construction projects using interpretive structural modelling approach
    Shrivas, Abhishek
    Singla, Harish Kumar
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (08) : 1455 - 1463
  • [9] Interrelationships among Critical Success Factors of Construction Projects Based on the Structural Equation Model
    Chen, Yong Qiang
    Zhang, Yang Bing
    Liu, Jun Ying
    Mo, Peng
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2012, 28 (03) : 243 - 251
  • [10] Structural Equation Modelling (SEM) Approach On Inappropriate Construction Equipment Delay Factors
    Indhu, B.
    Yogeswari, K.
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2021, 7 (07): : 1156 - 1168