Monitoring and Numerical Analyses of the Steel Railway Arch Bridge: A Case Study

被引:0
|
作者
Olaszek, Piotr [1 ]
Swiercz, Andrzej [2 ]
Wyczalek, Ireneusz [3 ]
Kolakowski, Przemyslaw [4 ]
机构
[1] Rd & Bridge Res Inst, Ul Instytu Towa 1, PL-03302 Warsaw, Poland
[2] Polish Acad Sci, Inst Fundamental Technol Res, Adolfa Pawinskiego 5B, PL-02106 Warsaw, Poland
[3] Bydgoszcz Univ Sci & Technol, Inst Civil & Environm Engn & Architecture, Al Prof S Kaliskiego 7, PL-85796 Bydgoszcz, Poland
[4] Adaptronica Sp Zoo, Ul Szpitalna 32, PL-05092 Lomianki, Poland
关键词
Arch-tied railway bridge; Bridge monitoring; Load testing; Bridge vibration; Numerical model calibration; SERVICE LIFE; FATIGUE; HANGERS; VIBRATION;
D O I
10.1061/JBENF2.BEENG-6962
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The subject of research is a steel arch-tied bridge at a high-speed railway line in Poland. After the construction was completed, a resonance phenomenon was observed at the bridge, consisting of the occurrence of intense (visible to the unaided eye) undamped vibrations of some vertical hangers in the horizontal direction, transverse to the track axis. These vibrations occurred without the presence of a railway load on the bridge. Before the bridge was put into operation, an acceptance static and dynamic load test was performed, and then the bridge deck vibrations were monitored for a year. The research during dynamic loads testing included both quasi-static (10 km/h) and high-speed (200 km/h) testing train passages. The vertical displacement measurements were carried out in three cross sections of the span, and the acceleration of vibrations on girders and selected hangers was also measured. Next, an innovative system for determining displacements indirectly using inertial sensors (inclinometers and accelerometers) was used for bridge deck vibration monitoring. The primary aim of the research was to investigate the possibility of assessing the safe operation of the bridge using a monitoring system consisting of a limited number of inertial sensors. The second aim was to verify the feasibility of calibrating the numerical model based on the results of dynamic load testing. Numerical analyses of the behavior of the bridge during the passage of trains with speeds up to 200 km/h were carried out. The developed and calibrated numerical model provides additional information about the overall structural vibrations, facilitating the interpretation of outcomes of the monitoring system. No significant impact of hanger vibrations on the monitored displacements and accelerations of the bridge deck vibrations during the passage of trains was found.
引用
收藏
页数:16
相关论文
共 50 条
  • [31] Performance of the effect of fractured member of an old steel truss railway bridge: A case study of hardinge bridge
    Awall, M. R.
    Rahman, M. A.
    Hasan, M. M.
    Hossain, M. A. S.
    Uddin, K. M. S.
    BRIDGE STRUCTURES, 2018, 14 (01) : 35 - 45
  • [32] Study on the Vehicle- Bridge Coupling Vibration of Steel Arch Bridge
    Li, Zilin
    Zhou, Peiyuan
    Yun, Zhenbo
    ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 233 - +
  • [33] Behavior Analysis and Early Warning of Girder Deflections of a Steel-Truss Arch Railway Bridge under the Effects of Temperature and Trains: Case Study
    Zhao, Han-Wei
    Ding, You-Liang
    Nagarajaiah, Satish
    Li, Ai-Qun
    JOURNAL OF BRIDGE ENGINEERING, 2019, 24 (01)
  • [34] Numerical investigation of a steel tied arch bridge under fire loading
    Covi, Patrick
    Tondini, Nicola
    ce/papers, 2023, 6 (3-4) : 2086 - 2091
  • [35] Analysis of large-span steel concrete railway arch bridge suspender tension
    Xu, Jialin
    SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 1259 - 1263
  • [36] Structural health monitoring of a steel railway bridge using optical fibre Bragg grating sensors and numerical simulation
    Tsamasphyros, G.
    Kanderakis, G.
    Koulasis, E.
    Furnarakis, N.
    Astreinidis, V.
    Vouthounis, P.
    PROCEEDINGS OF THE THIRD EUROPEAN WORKSHOP STRUCTURAL HEALTH MONITORING 2006, 2006, : 341 - +
  • [37] The Field Monitoring of Buried Corrugated Steel Arch Bridge during Construction
    Wang Quanlu
    Yang Chengdong
    Zhang Mengdong
    CIVIL ENGINEERING IN CHINA - CURRENT PRACTICE AND RESEARCH REPORT, 2010, : 296 - 300
  • [38] Validation and application of wireless monitoring system on the Wuyuan steel arch bridge
    Song, Y.
    Lei, Y.
    Shen, W. A.
    STRUCTURAL CONDITION ASSESSMENT, MONITORING AND IMPROVEMENT, VOLS 1 AND 2, 2007, : 819 - 824
  • [39] Seismic response analyses of a concrete-filled steel tubular arch bridge
    Du, SY
    Chen, H
    Yin, XG
    Sun, Z
    PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON EARTHQUAKE ENGINEERING: NEW FRONTIER AND RESEARCH TRANSFORMATION, 2004, : 511 - 514
  • [40] Dongping Channel Bridge: Long-Span Steel Arch Bridge in High-Speed Railway, China
    Liu, Wenshuo
    Dai, Gonglian
    STRUCTURAL ENGINEERING INTERNATIONAL, 2011, 21 (04) : 492 - 496