Portfolio Management of Infrastructure Projects

被引:0
|
作者
Emefu, Emmanuel [1 ]
Basnet, Kulchandra [1 ]
Minoretti, Arianna [2 ]
Laedre, Ola [2 ]
机构
[1] Norwegian Univ Sci & Technol, Dept Ind Econ & Technol Management, Trondheim, Norway
[2] Norwegian Univ Sci & Technol, Dept Civil & Environm Engn, Trondheim, Norway
关键词
SELECTION;
D O I
10.1088/1755-1315/1389/1/012031
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Project portfolio management (PPM) in guiding infrastructure development is often overlooked though it has crucial importance. PPM has been categorized into two phases. The first phase is about selecting the right projects in a portfolio while the second phase is about managing the selected projects to maintain strategic alignment with the organizational goals. The paper investigates the existing PPM practices in the Norwegian infrastructure sector to provide possible improvements for successful infrastructure project delivery. A literature review and structured interviews with selected experts in the infrastructural sector were carried out. The findings reveal that literature often focuses on criteria for portfolio selection, leaving the second phase of PPM with managing the selected projects unexamined. This happens despite all the interview respondents saying that portfolio management is important for maintaining strategic alignment with the organizational objectives. The interviews revealed that there is no standardized framework or guidelines yet for managing projects in portfolios for infrastructures. Significantly, the study found that there is a big contrast in the way the private and public organizations manage PPM. This study concludes that there is a need for further research to bridge gaps, enhance the practical applicability of the project portfolio management principles, and possibly establish a standardized framework fitted to the Norwegian Infrastructure projects.
引用
收藏
页数:13
相关论文
共 50 条
  • [41] Geotechnical Risk Management in Dutch Public Infrastructure Projects
    Brandsen, Cees
    Cools, Paul M. C. B. M.
    GEOTECHNICAL SAFETY AND RISK V, 2015, : 16 - 22
  • [42] Priorities management in the portfolio of projects in complex and dynamically variable environments
    Babayev, Igbal
    2017 12TH INTERNATIONAL SCIENTIFIC AND TECHNICAL CONFERENCE ON COMPUTER SCIENCES AND INFORMATION TECHNOLOGIES (CSIT), VOL. 2, 2017, : 187 - 191
  • [43] A Wheelbarrow Full of Frogs: Understanding Portfolio Management for Agile Projects
    Smeekes, Isabelle
    Borgman, Hans
    Heier, Hauke
    PROCEEDINGS OF THE 51ST ANNUAL HAWAII INTERNATIONAL CONFERENCE ON SYSTEM SCIENCES (HICSS), 2018, : 5473 - 5482
  • [44] Integrated project portfolio management - Transparent and efficient IT-Projects
    不详
    BWK, 2008, 60 (05): : 46 - 47
  • [45] LINKING PROJECTS TO BUSINESS STRATEGY THROUGH PROJECT PORTFOLIO MANAGEMENT
    Buys, A. J.
    Stander, M. J.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2010, 21 (01) : 59 - 68
  • [46] Instrument for Projects Assessment in Portfolio Management of Software Developing Companies
    Rusch, Merilis
    de Oliveira, Leonardo Rocha
    REVISTA GESTAO & TECNOLOGIA-JOURNAL OF MANAGEMENT AND TECHNOLOGY, 2012, 12 (02): : 113 - 140
  • [47] Making Sense of Projects—Developing Project Portfolio Management Capabilities
    Ahlemann F.
    Bergan P.
    Karger E.
    Greulich M.
    Reining S.
    Schmalenbach Journal of Business Research, 2024, 76 (2): : 293 - 325
  • [48] Applying Intelligent Portfolio Management to the Evaluation of Stalled Construction Projects
    Erzaij, Kadhim Raheim
    Hatem, Wadhah A.
    Maula, Baydaa Hussain
    OPEN ENGINEERING, 2020, 10 (01): : 552 - 562
  • [49] The Iron Triangle of Projects Management: Quality, Schedule and Cost of Road Infrastructure Projects in Egypt
    Abu El-Maaty, Ahmed
    Akal, Ahmed Yousry
    El-Hamrawy, Saad A.
    TOWARDS SUSTAINABLE CITIES IN ASIA AND THE MIDDLE EAST, 2018, : 1 - 14
  • [50] Projects Portfolio Prototyping
    Bocewicz, Grzegorz
    Muszynski, Wojciech
    Wojcik, Robert
    Banaszak, Zbigniew
    2008 CONFERENCE ON HUMAN SYSTEM INTERACTIONS, VOLS 1 AND 2, 2008, : 948 - 953