Bi-objective dynamic tugboat scheduling with speed optimization under stochastic and time-varying service demands

被引:1
|
作者
Wei, Xiaoyang [1 ]
Lau, Hoong Chuin [2 ]
Xiao, Zhe [1 ]
Fu, Xiuju [1 ]
Zhang, Xiaocai [1 ]
Qin, Zheng [1 ]
机构
[1] ASTAR, Inst High Performance Comp, 1 Fusionopolis Way,Connexis North Tower, Singapore 138632, Singapore
[2] Singapore Management Univ, Sch Comp & Informat Syst, 80 Stamford Rd, Singapore 178902, Singapore
关键词
Dynamic and stochastic programming; Multi-objective optimization; Speed optimization; Markov decision process; Proactive waiting decision; Tugboat scheduling;
D O I
10.1016/j.tre.2024.103876
中图分类号
F [经济];
学科分类号
02 ;
摘要
With the growing emphasis on green shipping to reduce the environmental impact of maritime transportation, optimizing fuel consumption with maintaining high service quality has become critical in port operations. Ports are essential nodes in global supply chains, where tugboats play a pivotal role in the safe and efficient maneuvering of ships within constrained environments. However, existing literature lacks approaches that address tugboat scheduling under realistic operational conditions. To fill the research gap, this is the first work to propose the bi-objective dynamic tugboat scheduling problem that optimizes speed under stochastic and time-varying demands, aiming to minimize fuel consumption and manage service punctuality across a heterogeneous fleet. For the first time, we develop an extended Markov decision process framework that integrates both reactive task assignments and proactive waiting decisions, considering the dual objectives. Subsequently, an initial schedule for known requests is established using a mixed- integer linear programming model, and an anticipatory approximate dynamic programming method dynamically incorporates emerging demands through task assignments and waiting plans. This approach is further enhanced by an improved rollout algorithm to anticipate future scenarios and make decisions efficiently. Applied to the Singapore port, our methodology achieves a 12.8% reduction in the total sail cost compared to the tugboat company's scheduling practices, resulting in significant daily savings. The results with benchmarking against three methods demonstrate improvements in cost efficiency and service punctuality, meanwhile, extensive sensitivity analysis provides managerial insights for operational practice.
引用
收藏
页数:25
相关论文
共 50 条
  • [21] Infinite horizon production scheduling in time-varying systems under stochastic demand
    Cheevaprawatdomrong, T
    Smith, RL
    OPERATIONS RESEARCH, 2004, 52 (01) : 105 - 115
  • [22] Bi-Objective Modeling and Optimization for Stochastic Two-Stage Open Shop Scheduling Problems in the Sharing Economy
    Fu, Yaping
    Li, Haobin
    Huang, Min
    Xiao, Hui
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2023, 70 (10) : 3395 - 3409
  • [23] Bi-objective dynamic optimization of a nonlinear time-delay system in microbial batch process
    Liu, Chongyang
    Gong, Zhaohua
    Teo, Kok Lay
    Loxton, Ryan
    Feng, Enmin
    OPTIMIZATION LETTERS, 2018, 12 (06) : 1249 - 1264
  • [24] Bi-objective dynamic optimization of a nonlinear time-delay system in microbial batch process
    Chongyang Liu
    Zhaohua Gong
    Kok Lay Teo
    Ryan Loxton
    Enmin Feng
    Optimization Letters, 2018, 12 : 1249 - 1264
  • [25] Solving dynamic satellite image data downlink scheduling problem via an adaptive bi-objective optimization algorithm
    Chang, Zhongxiang
    Punnen, Abraham P.
    Zhou, Zhongbao
    Cheng, Shi
    COMPUTERS & OPERATIONS RESEARCH, 2023, 160
  • [26] Optimizing air conditioning loads scheduling: A bi-objective dynamic optimization algorithm considering life loss impact
    Li, Zhiwei
    Hu, Wenhao
    Wu, Pei
    Cong, Zhihan
    Zhao, Shuqiang
    IET RENEWABLE POWER GENERATION, 2024, 18 (S1) : 4277 - 4287
  • [27] Bi-objective simulation optimization for online feedback control of variable speed limits considering uncertain traffic demands and compliance behaviours
    Wei, Xiang
    Zheng, Liang
    Liu, Pengjie
    Zhang, Shuaichao
    Tang, Hewei
    TRANSPORTATION SAFETY AND ENVIRONMENT, 2024, 6 (04):
  • [28] Handling time-varying constraints and objectives in dynamic evolutionary multi-objective optimization
    Azzouz, Radhia
    Bechikh, Slim
    Ben Said, Lamjed
    Trabelsi, Walid
    SWARM AND EVOLUTIONARY COMPUTATION, 2018, 39 : 222 - 248
  • [29] Bi-objective unrelated parallel machine joint scheduling of jobs and preventive maintenance with a dynamic speed-scaling technique
    Assia S.
    JEFFALI F.
    Barkany Abdellah E.
    ZIANI E.
    Bouchnaif J.
    Materials Today: Proceedings, 2023, 72 : 3454 - 3462
  • [30] Bi-objective Optimization for Scheduling on Identical Parallel Machine Considering Preventive Maintenance and Job's Release Time
    Shen, Chunchun
    Chen, Yarong
    Chou, Fuh-Der
    Huang, Peiyu
    2021 3RD INTERNATIONAL CONFERENCE ON MACHINE LEARNING, BIG DATA AND BUSINESS INTELLIGENCE (MLBDBI 2021), 2021, : 630 - 637