Enabling circularity in Turkish construction: a case of BIM-based material management utilizing material passports

被引:0
|
作者
Toprakli, Abdurrahman Yagmur [1 ,2 ]
机构
[1] Gazi Univ, Dept Architecture, Ankara, Turkiye
[2] Innoarc Arge Ltd Sti Gazi Teknopk, Ankara, Turkiye
关键词
Circular economy; Building information modeling (BIM); Material passports; Sustainable construction; Construction waste; Turkey; ECONOMY; SUSTAINABILITY;
D O I
10.1108/SASBE-05-2024-0199
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
PurposeThe Turkish construction sector, facing mounting environmental pressures, needs to rapidly adopt circular economy (CE) principles. However, a critical barrier is the lack of accessible and comprehensive material information. This paper investigates how building information modeling (BIM) can facilitate the adoption of material passports (MPs) to overcome this challenge and helps enabling circularity in Turkish construction.Design/methodology/approachA case study approach is adopted, focusing on the New Istanbul Esenler Arena, a major sports facility designed with BIM. An in-depth analysis of the project's BIM model and material data was conducted to develop a practical framework for integrating MPs into BIM workflows. The framework outlines a comprehensive MP data structure, addresses technical integration strategies and highlights the importance of stakeholder collaboration.FindingsThe research demonstrates that integrating MPs with BIM has the potential to significantly enhance material tracking throughout the building lifecycle, leading to more informed decision-making regarding material selection, reuse and recycling. This approach can improve material recovery rates, reduce construction waste and minimize the environmental impact of construction projects. The study also identifies key challenges to MP implementation, such as ensuring data accuracy and interoperability, and proposes strategies to overcome these hurdles.Originality/valueThis paper contributes to the limited but growing body of knowledge on the practical implementation of BIM and MPs for circular construction, particularly in the Turkish context. The proposed framework, informed by a real-world case study, provides valuable guidance for construction professionals, policymakers and researchers seeking to accelerate the transition to a circular economy in the built environment.
引用
收藏
页数:17
相关论文
共 50 条
  • [41] Methods to improve BIM-based estimations of major building material quantities in Life Cycle Assessment
    Roh, S.
    Tae, S.
    Shin, S.
    Chae, C.
    Suk, S.
    Ford, G.
    ADVANCES IN CIVIL, ARCHITECTURAL, STRUCTURAL AND CONSTRUCTIONAL ENGINEERING, 2016, : 299 - 303
  • [42] The Identification, Development, and Evaluation of BIM-ARDM: A BIM-Based AR Defect Management System for Construction Inspections
    May, Kieran W.
    Chandani, K. C.
    Ochoa, Jose Jorge
    Gu, Ning
    Walsh, James
    Smith, Ross T.
    Thomas, Bruce H.
    BUILDINGS, 2022, 12 (02)
  • [43] Factors, Challenges and Strategies of Trust in BIM-Based Construction Projects: A Case Study in Malaysia
    Farouk, Abdelrahman M.
    Zulhisham, Ahmad Zhahiruddin
    Lee, Yong Siang
    Rajabi, Mohammad Sadra
    Rahman, Rahimi A.
    INFRASTRUCTURES, 2023, 8 (01)
  • [44] BIM-based and AR Application Combined with Location-Based Management System for the Improvement of the Construction Performance
    Ratajczak, Julia
    Riedl, Michael
    Matt, Dominik T.
    BUILDINGS, 2019, 9 (05)
  • [45] Integrated BIM-based simulation for automated time-space conflict management in construction projects
    Dashti, Mohammad Saleh
    RezaZadeh, Mohammad
    Khanzadi, Mostafa
    Taghaddos, Hosein
    AUTOMATION IN CONSTRUCTION, 2021, 132
  • [46] A BIM-Based construction and demolition waste information management system for greenhouse gas quantification and reduction
    Xu, Jiuping
    Shi, Yi
    Xie, Yachen
    Zhao, Siwei
    JOURNAL OF CLEANER PRODUCTION, 2019, 229 : 308 - 324
  • [47] Research on the application of BIM-based green construction management in the whole life cycle of hydraulic engineering
    Yang, Zhen
    Li, Meihong
    Chen, En Dian
    Li, Hao
    Cong, Cheng Shi
    Zhao, Fang
    WATER SUPPLY, 2023, 23 (08) : 3309 - 3322
  • [48] Determination of Optimal Rolling Planning Period for the Management of BIM-Based Construction Supply Chain Processes
    Chen, Qian
    de Soto, Borja Garcia
    Adey, Bryan T.
    CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 263 - 273
  • [49] Application research of BIM-based construction management in railway station complex reconstruction and extension project
    Lian, Xiye
    He, Yuelei
    Cheng, Yan
    Lu, Hongyao
    Liu, Jun
    Journal of Railway Science and Engineering, 2020, 17 (04) : 1036 - 1042
  • [50] Research and Application of BIM-based Specification-compliant Field Quality Management for Lean Construction
    Chen, Lijuan
    Wu, Qinglin
    Xie, Xiong
    2019 3RD INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2019), 2019, 267