Competitive evaluation and multi-stage planning of park integrated energy systems

被引:0
|
作者
Yongtao Guo [1 ]
Yue Xiang [1 ]
Zhukui Tan [2 ]
Hongcai Zhang [3 ]
Ji Li [4 ]
Zechun Hu [5 ]
Fang Liu [6 ]
Junyong Liu [1 ]
机构
[1] Sichuan University,College of Electrical Engineering
[2] China Southern Power Grid Guizhou Power Grid Co.,Electric Power Research Institute
[3] Ltd,State Key Laboratory of Internet of Things for Smart City, Department of Electrical and Computer Engineering
[4] University of Macau,Department of Electrical Engineering
[5] China Academy of Building Research,undefined
[6] Tsinghua University,undefined
[7] State Grid Sichuan Economic Research Institute,undefined
关键词
D O I
10.1038/s41598-025-92431-9
中图分类号
学科分类号
摘要
Optimal planning for the park integrated energy system (PIES) is essential for energy efficiency improvement and carbon neutrality. A reasonable evaluation method is the key to guide PIES planning. However, indicators for the PIES planning schemes are various with high penetration of renewable energy, large carbon emissions and multiple energy forms coupling, which brings challenges to find out the benchmark planning scheme for PIES development. Herein, we extend a competitive evaluation method that considers the aspects of energy, economy, environment, reliability and greening development level for PIES with different energy planning trends. We formulate a multi-stage planning model for PIES dynamic development aiming at investment and operation cost minimization. We set a group of comparable PIESs with different energy planning trends to evaluate and determine the benchmark PIES to motivate the others. The competitiveness of our evaluation method is reflected in that the benchmark is determined by the competition of different PIESs and it may change through multi-stage planning. A practical PIES with eight functional areas is adopted for competitive evaluation in multi-criteria over multi-stage planning optimization, and their pros and cons are evaluated and compared. By comparing the evaluation efficiency, the benchmark of PIES planning can be dynamically adjusted.
引用
收藏
相关论文
共 50 条
  • [31] A Multi-Stage Generation Expansion Planning For Low Carbon Power Systems
    Akbarzade, Hossein
    Amraee, Turaj
    2020 28TH IRANIAN CONFERENCE ON ELECTRICAL ENGINEERING (ICEE), 2020, : 1253 - 1257
  • [32] Biogas from energy crops: Evaluation of a multi-stage procedure
    Colussi, I.
    Cortesi, A.
    Gallo, V.
    Stefani, N.
    Vitanza, R.
    JOURNAL OF BIOTECHNOLOGY, 2010, 150 : S168 - S168
  • [33] MANGO: A novel optimization model for the long-term, multi-stage planning of decentralized multi-energy systems
    Mavromatidis, Georgios
    Petkov, Ivalin
    APPLIED ENERGY, 2021, 288
  • [34] A multi-stage planning model for transitioning to low-carbon integrated electric power and natural gas systems
    Wei, Zhinong
    Yang, Li
    Chen, Sheng
    Ma, Zhoujun
    Zang, Haixiang
    Fei, Youdie
    ENERGY, 2022, 254
  • [35] Multi-stage distributionally robust planning of energy storage capacity considering flexibility
    Zhu X.
    Shan Y.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2023, 43 (06): : 152 - 159and167
  • [36] Optimal Planning of Integrated Multi-Energy Systems
    van Beuzekom, I.
    Gibescu, M.
    Pinson, P.
    Slootweg, J. G.
    2017 IEEE MANCHESTER POWERTECH, 2017,
  • [37] Requirements for Integrated Planning of Multi-Energy Systems
    Thie, Nicolas
    Franken, Marco
    Schwaeppe, Henrik
    Boettcher, Luis
    Mueller, Christoph
    Moser, Albert
    Schumann, Klemens
    Vigo, Daniele
    Monaci, Michele
    Paronuzzi, Paolo
    Punzo, Antonio
    Pozzi, Matteo
    Gordini, Angelo
    Cakirer, Kemal Burak
    Acan, Burcin
    Desideri, Umberto
    Bischi, Aldo
    2020 6TH IEEE INTERNATIONAL ENERGY CONFERENCE (ENERGYCON), 2020, : 696 - 701
  • [38] Multi-stage expansion planning of energy storage integrated soft open points considering tie-line reconstruction
    Peng Li
    Jie Ji
    Sirui Chen
    Haoran Ji
    Jing Xu
    Guanyu Song
    Jinli Zhao
    Jianzhong Wu
    Chengshan Wang
    Protection and Control of Modern Power Systems, 2022, 7
  • [39] Multi-stage expansion planning of energy storage integrated soft open points considering tie-line reconstruction
    Li, Peng
    Ji, Jie
    Chen, Sirui
    Ji, Haoran
    Xu, Jing
    Song, Guanyu
    Zhao, Jinli
    Wu, Jianzhong
    Wang, Chengshan
    PROTECTION AND CONTROL OF MODERN POWER SYSTEMS, 2022, 7 (01)
  • [40] Load and energy management for factories through multi-stage production planning and optimization
    Suesse, Marian
    Prell, Bastian
    Stoldt, Johannes
    Strehle, Hanns-Martin
    Richter, Mark
    Schlegel, Andreas
    Putz, Matthias
    26TH CIRP CONFERENCE ON LIFE CYCLE ENGINEERING (LCE), 2019, 80 : 257 - 262