A strip-packing constructive algorithm with deep reinforcement learning for dynamic resource-constrained seru scheduling problems

被引:0
|
作者
Yiran Xiang [1 ]
Zhe Zhang [1 ]
Xue Gong [1 ]
Xiaoling Song [1 ]
Yong Yin [2 ]
机构
[1] Nanjing University of Science and Technology,School of Economics and Management
[2] Doshisha University,Graduate School of Business
关键词
Scheduling; Deep reinforcement learning; Resource constraints; Optimization;
D O I
10.1007/s00500-024-09815-8
中图分类号
学科分类号
摘要
This study focuses on unspecified dynamic seru scheduling problems with resource constraints (UDSS-R) in seru production system (SPS). A mixed integer linear programming model is formulated to minimize the makespan, which is solved sequentially from both allocation and scheduling perspectives by a strip-packing constructive algorithm (SPCA) with deep reinforcement learning (DRL). The training samples are trained by the DRL model, and the reward values obtained are calculated by SPCA to train the network so that the agent can find a better solution. The output of DRL is the scheduling order of jobs in serus, while the solution of UDSS-R is solved by SPCA. Finally, a set of test instances are generated to conduct computational experiments with different instance scales for the DRL-SPCA, and the results confirm the effectiveness of proposed DRL-SPCA in solving UDSS-R with more outstanding performance in terms of solution quality and efficiency, across three data scales (10 serus × 100 jobs, 20 serus × 250 jobs, and 30 serus × 400 jobs), compared with GA and SAA, the Avg. RPD of DRL-SPCA decreased by 9.93% and 7.56%, 13.36% and 10.72%, and 9.09% and 7.08%, respectively. In addition, the Avg. CPU time was reduced by 29.53% and 27.93%, 57.48% and 57.04%, and 61.73% and 61.76%, respectively.
引用
收藏
页码:9785 / 9802
页数:17
相关论文
共 50 条
  • [31] The Genetic Algorithm with two point crossover to solve the Resource-Constrained Project Scheduling Problems
    Ouerfelli, Hela
    Dammak, Abdelaziz
    2013 5TH INTERNATIONAL CONFERENCE ON MODELING, SIMULATION AND APPLIED OPTIMIZATION (ICMSAO), 2013,
  • [32] A Scale-Free Based Memetic Algorithm for Resource-Constrained Project Scheduling Problems
    Wang, Lixia
    Liu, Jing
    INTELLIGENT DATA ENGINEERING AND AUTOMATED LEARNING - IDEAL 2013, 2013, 8206 : 202 - 209
  • [33] Defeating Proactive Jammers Using Deep Reinforcement Learning for Resource-Constrained IoT Networks
    Ali, Abubakar S.
    Naser, Shimaa
    Muhaidat, Sami
    2023 IEEE 34TH ANNUAL INTERNATIONAL SYMPOSIUM ON PERSONAL, INDOOR AND MOBILE RADIO COMMUNICATIONS, PIMRC, 2023,
  • [34] Reinforcement Learning Strategy for Solving the Resource-Constrained Project Scheduling Problem by a Team of A-Teams
    Jedrzejowicz, Piotr
    Ratajczak-Ropel, Ewa
    INTELLIGENT INFORMATION AND DATABASE SYSTEMS, PT II, 2014, 8398 : 197 - 206
  • [35] Resource-Constrained Implementation of Deep Learning Algorithms for Dynamic Touch Modality Classification
    Ali, Haydar Al Haj
    Gianoglio, Christian
    Ibrahim, Ali
    Valle, Maurizio
    ADVANCES IN SYSTEM-INTEGRATED INTELLIGENCE, SYSINT 2022, 2023, 546 : 105 - 115
  • [36] A Teaching-Learning-Based Optimization Algorithm for the Resource-Constrained Project Scheduling Problem
    Joshi, Dheeraj
    Mittal, M. L.
    Kumar, Manish
    HARMONY SEARCH AND NATURE INSPIRED OPTIMIZATION ALGORITHMS, 2019, 741 : 1101 - 1109
  • [37] A moving block sequence-based evolutionary algorithm for resource-constrained project scheduling problems
    Hao, Xingxing
    Liu, Jing
    Yuan, Xiaoxiao
    Tang, Xianglong
    Li, Zhangtao
    INTERNATIONAL JOURNAL OF BIO-INSPIRED COMPUTATION, 2019, 14 (02) : 85 - 102
  • [38] Chaos-based improved immune algorithm (CBIIA) for resource-constrained project scheduling problems
    Wu, Shanshan
    Wan, Hung-Da
    Shukla, Sanjay Kumar
    Li, Beizhi
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (04) : 3387 - 3395
  • [39] EFFICIENT INTEGER PROGRAMMING ALGORITHM WITH NETWORK CUTS FOR SOLVING RESOURCE-CONSTRAINED SCHEDULING PROBLEMS.
    Talbot, F.Brian
    Patterson, James H.
    Management Science, 1978, 24 (11) : 1163 - 1174
  • [40] Deep Reinforcement Learning for Trajectory Path Planning and Distributed Inference in Resource-Constrained UAV Swarms
    Dhuheir, Marwan
    Baccour, Emna
    Erbad, Aiman
    Al-Obaidi, Sinan Sabeeh
    Hamdi, Mounir
    IEEE INTERNET OF THINGS JOURNAL, 2023, 10 (09) : 8185 - 8201