Time-optimal path parameterization planning for automatic fiber placement based on reachability quadratic analysis

被引:0
|
作者
Dong, Guangyu [1 ,2 ]
Li, Wenpeng [1 ,2 ]
Du, Yuhong [1 ,2 ]
Yang, Leicheng [1 ,2 ]
机构
[1] Tiangong Univ, Sch Mech Engn, Tianjin 300387, Peoples R China
[2] Key Lab Adv Mechatron Equipment Technol, Tianjin 300387, Peoples R China
来源
SCIENTIFIC REPORTS | 2025年 / 15卷 / 01期
关键词
Automated fiber placement; Time optimization; Path discretization; Trajectory fitting;
D O I
10.1038/s41598-025-91718-1
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Automated fiber placement technology can be used to improve the rigidity and load-bearing capacity of hyperbolic surface components in industrial fields such as automobiles, ships, and aviation. However, because multiple layers of fibers need to be continuously placed to meet usage requirements, the production efficiency of fiber placement is low. To achieve time-optimal path parameterization (TOPP), this study optimizes the path discrete point quantity and time parameters of TOPP in order to maximize time optimization. Firstly, in order to ensure the accuracy of surface fiber placement, a trajectory error calculation method based on third-order conical spiral approximation is introduced to constrain trajectory accuracy. Additionally, the fiber placement path normal change that may affect the stability of fiber placement force is also constrained. The maximum trajectory error and maximum surface normal change are used as constraints for the maximum step length of the path discrete points to reduce redundant points. Secondly, in response to the non-optimization problem of time parameters in TOPP, a new TOPP approach based on reachability quadratic analysis is proposed. Through coarse searching for discrete points, time parameters that better fulfill the characteristics of time optimization are solved and fitted by a polynomial. Finally, the grid points are densified for velocity planning. This study conducted simulation experiments on hyperbolic surface placement with a 6-RUS as the experimental object. The results show that under the same placement path, the traditional method Path1 takes a total of 2.05 s, while Path2 takes a total of 2.29 s. The proposed method in this study takes Path1 1.55 s and Path2 1.76 s, respectively, reducing the time by 0.5 and 0.53 s compared to the traditional method.
引用
收藏
页数:16
相关论文
共 50 条
  • [31] Analysis of solutions to the time-optimal planning and execution problem
    Allen, Thomas
    Scheding, Steven
    INTELLIGENT SERVICE ROBOTICS, 2012, 5 (04) : 245 - 258
  • [32] A NUMERICAL APPROACH FOR TIME-OPTIMAL PATH-PLANNING OF KINEMATICALLY REDUNDANT MANIPULATORS
    WU, CJ
    ROBOTICA, 1994, 12 : 401 - 410
  • [33] Stochastic time-optimal path-planning in uncertain, strong, and dynamic flows
    Subramani, Deepak N.
    Wei, Quantum J.
    Lermusiaux, Pierre F. J.
    COMPUTER METHODS IN APPLIED MECHANICS AND ENGINEERING, 2018, 333 : 218 - 237
  • [34] Time-optimal path planning for flat systems with application to a wheeled mobile robot
    Van Loock, Wannes
    Pipeleers, Goele
    Swevers, Jan
    2013 9TH INTERNATIONAL WORKSHOP ON ROBOT MOTION AND CONTROL (ROMOCO), 2013, : 192 - 196
  • [35] Time-optimal Trajectory Generation, Path Planning and Control for a Wood Patching Robot
    Hofmair, Matthias
    Boeck, Martin
    Kugi, Andreas
    2015 IEEE CONFERENCE ON CONTROL AND APPLICATIONS (CCA 2015), 2015, : 459 - 465
  • [36] Time-optimal path planning of moving sensors for parameter estimation of distributed systems
    Ucinski, Dariusz
    Chen, YangQuan
    2005 44th IEEE Conference on Decision and Control & European Control Conference, Vols 1-8, 2005, : 5257 - 5262
  • [37] A time-optimal path planning method for AUV docking under geometrical constraints
    Li, Zeyu
    Liu, Weidong
    Gao, Li'e
    Li, Le
    OCEANS 2019 - MARSEILLE, 2019,
  • [38] Task-level Time-optimal Machining Path Planning for Grinding Manipulators
    Diao, Shipu
    Chen, Xindu
    Wu, Lei
    PROCEEDINGS OF 2018 IEEE 9TH INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING AND SERVICE SCIENCE (ICSESS), 2018, : 825 - 830
  • [39] Smooth and time-optimal trajectory planning for industrial manipulators along specified path
    Constantinescu, D
    Croft, EA
    JOURNAL OF ROBOTIC SYSTEMS, 2000, 17 (05): : 233 - 249
  • [40] Efficient time-optimal path planning of AUV under the ocean currents based on graph and clustering strategy
    Sun, Yuanxi
    Gu, Rui
    Chen, Xiaohong
    Sun, Rui
    Xin, Liming
    Bai, Long
    OCEAN ENGINEERING, 2022, 259