Roof cutting mechanism of dense drilling in gob-side entry retaining and determination method of key parameters

被引:0
|
作者
Liu S. [1 ,2 ]
Li X. [1 ]
Zhu W. [3 ]
Fu M. [1 ,2 ]
Zhang D. [4 ]
Peng B. [4 ]
机构
[1] School of Energy Science and Engineering, Henan Polytechnic University, Jiaozuo
[2] State Collaborative Innovation Center of Coal Work Safety and Clean-efficiency Utilization, Jiaozuo
[3] China Railway Construction Group Co., Ltd., Beijing
[4] Sichuan Chuanmei Huarong Energy Co., Ltd., Chengdu
关键词
curved triangle plate; dense drilling; gob-side entry retaining; pressure relief by roof cutting; stress concentration between holes;
D O I
10.12438/cst.2023-1760
中图分类号
学科分类号
摘要
To achieve the safe and stable structural condition of the roof along the goaf under the roof cutting by dense drilling method, the stress distribution and fracture process of the roof strata between normal and dense drilling conditions were studied. Based on rock fracture theory and elastic theory, the stress distribution of the surrounding rock between dense drilling and the fracture process were analyzed before and after mining, clarifying the cutting mechanism of dense drilling and the interaction mechanism of concentrated stress between adjacent drilling. The calculation formula for the tensile-shear stress of the surrounding rock between dense drilling in the arc-shaped triangular panel structure at the end of the working face was derived. Based on this, the influence of different parameters on the tensile-shear stress of the surrounding rock between drilling was analyzed, and a determination method for the key parameters of roof cutting by dense drilling holes along the goaf was proposed. Research has shown that the dense drilling mainly increases the concentration of the surrounding rock's tensile and shear stress by changing the stress conditions around the densely drilled holes before and after mining, causing the expansion and connection of fractures between drilling and forming key rock layers for cutting. Before mining, the drill holes are mainly affected by horizontal compression stress, and after mining, the stress gradually changes to the tensile and shear stress caused by the rotation and subsidence of the goaf roof, and the state of the surrounding rock between the holes transitions from the weakening stage to the formation of crack stage, and then to the fracture stage. The magnitude of the tensile and shear stress of the surrounding rock between the densely drilled holes mainly depends on the thickness of the key rock layer and the ratio of the hole diameter to the hole spacing, and is negatively correlated with the hole height and spacing, and positively correlated with the angle and diameter of the drill holes. Based on this, a method for determining the key parameters of intensive drilling and cutting is proposed, and a plan for intensive drilling and cutting in the goaf with hard roof conditions on the 3124 N working face of Longtan Mine is designed, with a hole length of 8.3 m, an angle of 15°, a hole diameter of 48 mm, and a spacing of 500 mm. The deformation of the goaf roof after cutting is controllable and the overall stability is good, which proves that the arrangement parameters of intensive drilling and cutting are reasonable, and the determination method for the key parameters of roof cutting by dense drilling holes is effective and feasible. © 2024 China Coal Society. All rights reserved.
引用
收藏
页码:23 / 33
页数:10
相关论文
共 27 条
  • [11] SHEN Qian, Mechanism and application of pressure relief for roof cutting with dense drilling, Xuzhou:China University of Mining and Technology, pp. 46-48, (2020)
  • [12] YAO Qiangling, WANG Furong, MA Shoulong, Et al., Character-is-tics and control of strong underground pressure appear under irreg-ular section normal fault roadway pillar[J], Journal of Mining & Safety Engineering, 39, 6, (2022)
  • [13] ZHAO Yi, XIE Hongxin, YAO Qiangling, Roof cutting and pressure relief with dense drilling for roadway protection in Songxinzhuang Coal Mine[J], Coal Engineering, 55, 5, (2023)
  • [14] SUN Yanbin, SONG Houwu, PENG Xiangfeng, Dense drilling pressure relief in irregular district pillar along fault[J], Coal Engineering, 55, 3, (2023)
  • [15] YANG Qiang, Principle and application of dense borehole cutting roof and retaining roadway in, 16207 material roadway of Binhu Coal Mine, Xuzhou: China University of Mining and Technology, pp. 44-45, (2021)
  • [16] XIA Ze, YAO Qiangling, GUOSHENG Meng, Et al., Numerical study of stability of mining roadways with 6.0-m section coal pillars under influence of repeated mining[J], International Journal of Rock Mechanics and Mining Sciences, 138, (2021)
  • [17] ZHU Weibing, YU Bin, JU Jinfeng, Et al., Experimental study on horizontal“U–Y”periodical breakagecharacteristics of key strata in stope roof[J], Coal Science and Technology, 48, 2, (2020)
  • [18] YANG Jingxuan, LIU Changyou, YU Bin, Et al., An analysis on strong strata behaviors and stress transfer of the roadway approaching gob in triangle area of the face end[J], Journal of Mining & Safety Engineering, 33, 1, (2016)
  • [19] GAO Xiaojiang, Stability study in the end zone of mining face of full-mechanized caving, pp. 58-60, (2016)
  • [20] MA Binwen, DENG Zhigang, ZHAO Shankun, Et al., Analysis on the mechanism and influencing factors of drillingpressure relief to prevent rock burst[J], Coal Science and Technology, 48, 5, (2020)