Performance assessment of a 30.26 kW grid-connected photovoltaic plant in Egypt

被引:1
|
作者
Hassan, Amal A. [1 ]
Atia, Doaa M. [1 ]
El- Madany, Hanaa T. [1 ]
Eliwa, Aref Y. [1 ]
机构
[1] Elect Res Inst, Photovolta Cells Dept, Cairo, Egypt
来源
CLEAN ENERGY | 2024年 / 8卷 / 06期
关键词
photovoltaic grid-connected; performance analysis; energy yield; PV efficiency; data pre-processing; energy losses; PV SYSTEMS; ENERGY; CLIMATE; EFFICIENCY; DESIGN; IMPACT; DUST;
D O I
10.1093/ce/zkae074
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper presents an experimental analysis and performance evaluation of a grid-connected photovoltaic plant installed on the rooftop of the Electronics Research Institute in Cairo, Egypt. Cairo is classified as a hot-desert climate region according to the standard Koppen-Geiger climate classification system. Over a year, we monitored real-time data to assess key system performance metrics, such as energy yield, efficiencies, performance ratio, capacity factor, and losses. Based on the obtained experimental results, the highest final yield of 5.2498 hr/day was observed in the summer, whereas the lowest yield of 3.439 hr/day occurred in the winter months. The photovoltaic plant had an average annual system efficiency of 15.8%, while the photovoltaic and inverter had mean yearly efficiencies of 17.1% and 97.2%, respectively. The average annual performance ratio is 83.03%, and the capacity factor is 18.72%. The monthly total loss exhibited a linear rise alongside increasing ambient temperature and solar irradiance. The ambient temperature affected the system efficiency, photovoltaic efficiency, and performance ratio. The findings can help strengthen forecasts of future large-scale photovoltaic plants in hot desert climates. Moreover, they can guide the design, optimization, operation, and maintenance of new grid-connected photovoltaic systems. The performance of a 30.26 kW grid-connected photovoltaic plant is analyzed using a year's worth of real-time data to assess key system performance metrics, such as energy yield, efficiencies, performance ratio, capacity factor, and losses. Graphical Abstract
引用
收藏
页码:120 / 133
页数:14
相关论文
共 50 条
  • [21] SIMULATION OF GRID-CONNECTED PHOTOVOLTAIC POWER PLANT BASED ON FASTEST
    Li, Feng
    Li, Wei
    Xue, Feng
    Shi, Tao
    Zhu, Lingzhi
    2011 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2011,
  • [22] Performance assessment of a 400 kWp multi- technology photovoltaic grid-connected pilot plant in arid region of Algeria
    Chikh, Madjid
    Berkane, Smain
    Mahrane, Achour
    Sellami, Rabah
    Yassaa, Noureddine
    RENEWABLE ENERGY, 2021, 172 : 488 - 501
  • [23] Performance and Economic Assessment of a Grid-Connected Photovoltaic Power Plant with a Storage System: A Comparison between the North and the South of Italy
    Chiacchio, Ferdinando
    Famoso, Fabio
    D'Urso, Diego
    Cedola, Luca
    ENERGIES, 2019, 12 (12)
  • [24] Behavioral modeling of grid-connected photovoltaic inverters: Development and assessment
    Guerrero-Perez, J.
    De Jodar, E.
    Gomez-Lazaro, E.
    Molina-Garcia, A.
    RENEWABLE ENERGY, 2014, 68 : 686 - 696
  • [25] Computational Tool for Sizing and Assessment of Grid-Connected Photovoltaic Systems
    Figueiredo, Gilberto
    Macedo, Wilson
    Pinho, Joao Tavares
    2013 ISES SOLAR WORLD CONGRESS, 2014, 57 : 168 - +
  • [26] Economic evaluation of rooftop grid-connected photovoltaic systems for residential building in Egypt
    Gabr, Ahmed Z.
    Helal, Ahmed A.
    Abbasy, Nabil H.
    INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2020, 30 (06):
  • [27] Availability Assessment for Grid-Connected Photovoltaic Systems with Energy Storage
    Nemes, Ciprian
    Munteanu, Florin
    Rotariu, Mugurel
    Astanei, Dragos
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE AND EXPOSITION ON ELECTRICAL AND POWER ENGINEERING (EPE 2016), 2016, : 908 - 911
  • [28] Assessment of Harmonic Distortion in Small Grid-Connected Photovoltaic Systems
    Monteiro Oliveira, Luis Guilherme
    Boaventura, Wallace do Couto
    Amaral, Guilherme
    Mello, Joao Vitor G. C.
    Mendes, Victor Flores
    Macedo, Wilson Negrao
    Torres, Pedro Ferreira
    Piterman, Alexandre Schichman
    Rodrigues Corrade, Thales Jose
    Lopes, Bruno Marciano
    PROCEEDINGS OF 2016 17TH INTERNATIONAL CONFERENCE ON HARMONICS AND QUALITY OF POWER (ICHQP), 2016, : 810 - 815
  • [29] Experimental assessment of the waveform distortion in grid-connected photovoltaic installations
    Chicco, Gianfranco
    Schlabbach, Juergen
    Spertino, Filippo
    SOLAR ENERGY, 2009, 83 (07) : 1026 - 1039
  • [30] Photovoltaic Grid-connected Inverter Harmonic Compensation and Grid-connected Unified Control
    Xu Jin
    2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 696 - 699