Path Planning for Wall-climbing Robot in Volume Measurement of Vertical Tank

被引:0
|
作者
Wang T. [1 ]
Zhu S. [1 ]
Song W. [2 ,3 ]
Li C. [4 ]
Shi H. [4 ]
机构
[1] Ocean College, Zhejiang University, Zhoushan
[2] Zhejiang Lab, Hangzhou
[3] Robotics Institute, Zhejiang University, Ningbo
[4] Zhoushan Institute of Calibration and Testing for Quality and Technology Supervision, Zhoushan
来源
Jiqiren/Robot | 2024年 / 46卷 / 01期
关键词
measuring points distribution; path planning; vertical tank; volume measurement; wall-climbing robot;
D O I
10.13973/j.cnki.robot.230036
中图分类号
学科分类号
摘要
To meet the requirements of measuring the vertical tank volume, a measurement method combining a laser tracker and a wall-climbing robot is designed. In order to realize efficient and accurate measurement, a measuring path of the robot is planned based on MPD (measuring points distribution). Firstly, two measurement methods are adopted to adapt to the circumferentially and vertically sparse MPD respectively. Since the relationship between the measuring path and accuracy is not clear, a tank model is created to analyze the influence of MPD on the time and accuracy, and then the path pattern and its parameters are determined. Finally, simulation and physical experiments are carried out on the point cloud of a tank wall and a real tank respectively. A loss function is proposed to evaluate the path, and the field measurement results are compared with those of the total station method. The results show that the measurement based on the planned path can be completed quickly, and the measurement errors in both simulation and experiments are less than 0.04%, bringing an overall loss smaller than that of currently used measurement methods. © 2024 Chinese Academy of Sciences. All rights reserved.
引用
收藏
页码:36 / 44
页数:8
相关论文
共 24 条
  • [11] YIN S B., Research on the graded calibration and accuracy maintenance technique for industrial robot, (2015)
  • [12] LI X X, WANG J T, ZHANG J G, Et al., Engineering development of radial deviation metering robot of storage tank, Measurement & Control Technology, 36, 5, pp. 70-73, (2017)
  • [13] CHEN X L, WU Y P, HAO H D, Et al., Tracked wall-climbing robot for calibration of large vertical metal tanks, Applied Sciences, 9, 13, (2019)
  • [14] SZYBICKI D, OBAL P, KURC K, Et al., Programming of industrial robots using a laser tracker, Sensors, 22, 17, (2022)
  • [15] SLATER P A, DOWNEY J M, PIASECKI M T, Et al., Portable laser guided robotic metrology system, Antenna Measurement Techniques Association Symposium, (2019)
  • [16] ZHUANG J L, LI R F, CAO C Q, Et al., Autonomous scan path planning of measurement system for 3D long and thin tube, Robot, 41, 5, pp. 628-636, (2019)
  • [17] ZHU H, CHUNG J J, LAWRANCE N R J, Et al., Online informative path planning for active information gathering of a 3D surface, IEEE International Conference on Robotics and Automation, pp. 1488-1494, (2021)
  • [18] XU Z L, MA P S, GAO X G., The research on a new method based on wall-climbing robot for measuring the volume of oil tank, Mechanical Science and Technology, 22, 3, pp. 348-350, (2003)
  • [19] LIU J J, LI H J., Volume measurement of irregular objects based on improved point cloud slicing method, Acta Optica Sinica, 41, 23, pp. 133-145, (2021)
  • [20] GAO Y, LIU J, LI K P., Evaluation of localizability for path planning, Computer Engineering and Applications, 56, 18, pp. 58-62, (2020)