Chance-constrained scheduling considering frequency support from electric vehicles under multiple uncertainties

被引:0
|
作者
Liu, Yifeng [1 ]
Zeng, Wenyuan [1 ]
Chen, Meng [1 ]
He, Zhongshi [1 ]
Yuan, Yi [2 ]
Ding, Tao [2 ]
机构
[1] Hubei Power Exchange Ctr, Wuhan, Hubei, Peoples R China
[2] Xi An Jiao Tong Univ, Sch Elect Engn, Xian, Shaanxi, Peoples R China
关键词
power system control; power system operation and planning; SYSTEMS;
D O I
10.1049/rpg2.13171
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
With the share of renewable generation increasing, considerable synchronous generators have been displaced. This trend results in the decline of system inertia and thus raises the frequency secure issue. Concurrently, electric vehicles (EVs) proliferate. Numerous EVs hold a huge potential of frequency regulation in case of contingency as EVs are able to achieve primary frequency responses (PFRs) via vehicle to grid chargers. However, the value of frequency responses from aggregated EVs has not fully exploited. This paper, proposes a chance constrained scheduling model incorporating the ability of PFRs from aggregated EVs. The proposed model characterizes uncertainties associated PFR capacities from aggregated EVs and wind power forecast errors by the Wasserstein-metric ambiguity sets, which do not rely on distributional assumption, and then formulates uncertainties-related constraints as distributionally robust (DR) chance constraints. These DR chance constraints are reformulated as tractable linear programs. Consequently, the proposed model leads to a mixed-integer linear program. Numerical results on a modified IEEE 39-bus system show that incorporating PFR from EVs can reduce total costs from $4,540,396 to $4,431,233, which is reduced by 2.4%. The proposed model also achieves better reliability compared to traditional methods, demonstrating the distributionally robust optimization in enhancing electricity scheduling and rising renewable integration.
引用
收藏
页码:4348 / 4359
页数:12
相关论文
共 50 条
  • [31] Multi-objective Chance-constrained Optimal Day-ahead Scheduling Considering BESS Degradation
    Xu, Yan
    Zhao, Tianyang
    Zhao, Shuqiang
    Zhang, Jianhua
    Wang, Yang
    CSEE JOURNAL OF POWER AND ENERGY SYSTEMS, 2018, 4 (03): : 316 - 325
  • [32] Non-Gaussian Chance-Constrained Trajectory Planning for Autonomous Vehicles Under Agent Uncertainty
    Wang, Allen
    Jasour, Ashkan
    Williams, Brian C.
    IEEE ROBOTICS AND AUTOMATION LETTERS, 2020, 5 (04): : 6041 - 6048
  • [33] Demand response scheduling under uncertainty: Chance-constrained framework and application to an air separation unit
    Kelley, Morgan T.
    Baldick, Ross
    Baldea, Michael
    AICHE JOURNAL, 2020, 66 (09)
  • [34] Dynamic Congestion Management With Chance-Constrained MPC in Networked Microgrids Under Consumers-Related Uncertainties
    Omrani, Pouria
    Yektamoghadam, Hossein
    Nikoofard, Amirhossein
    Salehizadeh, Mohammad Reza
    Liu, J. Jay
    IEEE TRANSACTIONS ON CONSUMER ELECTRONICS, 2024, 70 (04) : 6738 - 6746
  • [35] Chance-constrained programming with robustness for lot-sizing and scheduling problems under complex uncertainty
    Hui, Jizhuang
    Wang, Shuai
    Bin, Zhu
    Xiong, Guangwei
    Lv, Jingxiang
    ASSEMBLY AUTOMATION, 2022, 42 (04) : 490 - 505
  • [36] Two-stage reactive power chance-constrained optimization method for an active distribution network considering DG uncertainties
    Lu, Ji
    Chang, Junxiao
    Zhang, Yunge
    E, Shiping
    Zeng, Chuihui
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2021, 49 (21): : 28 - 35
  • [37] Credibility-based chance-constrained multimode resource-constrained project scheduling problem under fuzzy uncertainty
    Liu, Huiran
    Fang, Zhiming
    Li, Renjie
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 171
  • [38] Bridging chance-constrained and stochastic optimization for risk estimation of virtual energy hubs dominated by hybrid vehicles under diverse uncertainties: To improve economic sustainability
    Han, Lu
    Wang, Dongxuan
    Liu, Yu
    SUSTAINABLE CITIES AND SOCIETY, 2024, 111
  • [39] Two-stage fuzzy chance-constrained programming: application to water resources management under dual uncertainties
    P. Guo
    G. H. Huang
    Stochastic Environmental Research and Risk Assessment, 2009, 23 : 349 - 359
  • [40] A fuzzy chance-constrained program for unit commitment problem considering demand response, electric vehicle and wind power
    Zhang, Ning
    Hu, Zhaoguang
    Han, Xue
    Zhang, Jian
    Zhou, Yuhui
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2015, 65 : 201 - 209