Lot-streaming in energy-efficient three-stage remanufacturing system scheduling problem with inequal and consistent sublots

被引:0
|
作者
Wang, Wenjie [1 ]
Yuan, Gang [2 ]
Pham, Duc Truong [3 ]
Zhang, Honghao [4 ]
Wang, Dekun [1 ]
Tian, Guangdong [5 ]
机构
[1] Zhengzhou Univ, Sch Mech & Power Engn, Zhengzhou 450001, Peoples R China
[2] Southeast Univ, Sch Mech Engn, Nanjing 212000, Peoples R China
[3] Univ Birmingham, Dept Mech Engn, Birmingham B152TT, England
[4] Shandong Univ, Sch Mech Engn, Jinan 250061, Peoples R China
[5] Beijing Univ Civil Engn & Architecture, Sch Machinery & Vehicles, Beijing 100044, Peoples R China
基金
中国国家自然科学基金;
关键词
Remanufacturing scheduling; Green manufacturing; Inequal and consistent sublots; Lot-streaming; Metaheuristics; Energy-efficient scheduling; FLOW-SHOP; ALGORITHM; MODEL; INDUSTRY;
D O I
10.1016/j.compeleceng.2024.109813
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
The well-accepted three-stage remanufacturing system scheduling aims to achieve intelligent and green remanufacturing by reasonably coordinating limited resources in the system involving disassembly, reprocessing, reassembly production stages. Currently, the lot-streaming production mode is increasingly favoured by scholars and enterprise managers due to its remarkable performance in reducing machines' idle time and improving production efficiency. This paper investigates an energy-efficient scheduling issue for three-stage remanufacturing systems under the lot-streaming environment where each large-sized lot is split into its constituent small-sized sublots whose sizes may be inequal but remain consistent among various operations. Foremost, a dual-objective optimization mathematical model aiming at concurrently minimizing the makespan and total energy consumption is built. Then, since its NP-hard property, an improved fruit fly optimization (IFFO) algorithm is accordingly introduced. IFFO adopts a problem-specific three-layer encoding mechanism that contains three key pieces of scheduling information, i.e., lot sequence, machine assignment, and lot size splitting. Besides, based on the lot-streaming property, two distinct decoding strategies, i.e., sublot preemption and lot preemption are also correspondingly integrated. In addition, several effective optimization techniques, such as the simulated annealing-based replacement mechanism and Sigma method, are also employed to seek high-quality Pareto solutions. A real case and several designed random small/large-sized instances are tested on IFFO and its peers under three performance indicators. To obtain a convincing and solid conclusion, the Wilcoxon signed-rank statistical test is executed as well. The overall experimental results show that IFFO is feasible and effective in addressing the studied problem.
引用
收藏
页数:30
相关论文
共 35 条
  • [21] Study on the performance of an energy-efficient three-stage auto-cascade refrigeration system enhanced with a pressure regulator
    Qin, Yanbin
    Li, Nanxi
    Zhang, Hua
    Liu, Baolin
    ENERGY, 2022, 258
  • [22] A Three-Stage Coordinated Optimization Scheduling Strategy for a CCHP Microgrid Energy Management System
    Xu, Yan
    Luo, Zhao
    Zhu, Zhendong
    Zhang, Zhiyuan
    Qin, Jinghui
    Wang, Hao
    Gao, Zeyong
    Yang, Zhichao
    PROCESSES, 2020, 8 (02)
  • [23] An energy-efficient multi-objective scheduling for flexible job-shop-type remanufacturing system
    Zhang, Wenkang
    Zheng, Yufan
    Ahmad, Rafiq
    JOURNAL OF MANUFACTURING SYSTEMS, 2023, 66 : 211 - 232
  • [24] An energy-efficient two-stage hybrid flow shop scheduling problem in a glass production
    Wang, Shijin
    Wang, Xiaodong
    Chu, Feng
    Yu, Jianbo
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (08) : 2283 - 2314
  • [25] Production costs and total completion time minimization for three-stage mixed-model assembly job shop scheduling with lot streaming and batch transfer
    Cheng, Lixin
    Tang, Qiuhua
    Zhang, Liping
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2024, 130
  • [26] A cooperative coevolutionary algorithm with problem-specific knowledge for energy-efficient scheduling in seru system
    Wu, Yuting
    Wang, Ling
    Zhuang, Xinying
    Wang, Jing-jing
    Chen, Jing-fang
    Zheng, Jie
    KNOWLEDGE-BASED SYSTEMS, 2023, 274
  • [27] Achieving successive methanation and low-carbon denitrogenation by a novel three-stage process for energy-efficient wastewater treatment
    Lei, Zhen
    Yang, Shuming
    Wang, Lianxu
    Huang, Xingyuan
    Wang, Xiaochang C.
    Li, Yu-You
    Li, Qian
    Zhao, Yu
    Chen, Rong
    JOURNAL OF CLEANER PRODUCTION, 2020, 276 (276)
  • [28] An energy-efficient multi-objective integrated process planning and scheduling for a flexible job-shop-type remanufacturing system
    Zhang, Wenkang
    Zheng, Yufan
    Ahmad, Rafiq
    ADVANCED ENGINEERING INFORMATICS, 2023, 56
  • [29] A reinforcement learning based memetic algorithm for energy-efficient distributed two-stage flexible job shop scheduling problem
    Geng, Kaifeng
    Liu, Li
    Wu, Shaoxing
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [30] An Energy-Efficient Three-Stage Amplifier Achieving a High Unity-Gain Bandwidth for Large Capacitive Loads Without Using a Compensation Zero
    Shin, Hongseok
    Kim, Jinuk
    Jang, Doojin
    Cho, Donghee
    Jung, Yoontae
    Cho, Hyungjoo
    Lee, Unbong
    Kim, Chul
    Ha, Sohmyung
    Je, Minkyu
    IEEE SOLID-STATE CIRCUITS LETTERS, 2020, 3 : 530 - 533