COMPREHENSIVE CEMENTING QUALITY ASSESSMENT AND RISK MANAGEMENT SYSTEM

被引:0
|
作者
Efendiyev, G. M. [1 ]
Moldabayeva, G. Z. [2 ]
Buktukov, N. S. [3 ]
Kuliyev, M. Y.
机构
[1] Minist Sci & Educ Azerbaijan Republ, Inst Oil & Gas, Baku, Azerbaijan
[2] Yessenov Univ, Aktau, Kazakhstan
[3] Azerbaijan State Oil & Ind Univ, Baku, Azerbaijan
来源
SOCAR PROCEEDINGS | 2024年 / 04期
关键词
Casing; cement quality; risk; acoustic logging of cement quality (ACL); probability and consequences; STORAGE; OIL;
D O I
10.5510/OGP20240401015
中图分类号
TE [石油、天然气工业];
学科分类号
0820 ;
摘要
Fastening the walls of wells is one of the most important stages that determines the quality of well construction in general, and the quality of fastening depends on several factors, primarily on the quality of the cement mortar. In this regard, the presented article is devoted to the problem of the quality of cementing well walls and assessing the risks of emergency situations due to poor-quality cementing. The article provides a methodology for assessment of the cementation quality of well walls and risk. Based on the results of processing acoustic logging data, cementometry and frequencies and the corresponding consequences in the form of qualitative and quantitative estimates of cementation, << constant risk >> curves were constructed to determine the magnitude of the risk. Based on the data obtained, diagrams that made it possible to monitor the dynamics of risks over the past five years at the field under study, taken as an example were constructed. As a result of statistical analysis, the << probability-consequences >> relationship (curves of constant risk of poor-quality cementing) was established for the field under consideration at different times, and their analytical approximations were obtained. The marked curves, being boundary ones, divide the coordinate plane into areas of acceptable and unacceptable risk. The area located below the constant risk curve is the area of acceptable risk. The area located above this curve is the area of unacceptable risk. The relationships between the state of contact between the column and the cement stone were established, expressed in the words <high<double right angle bracket>, << good >>, << <low<double right angle bracket>, << unsatisfactory quality>>.
引用
收藏
页码:42 / 47
页数:6
相关论文
共 50 条
  • [41] RISK MANAGEMENT AS A PART OF A QUALITY MANAGEMENT SYSTEM IN WOODWORKING COMPANIES
    Novakova, R.
    Paulikova, A.
    Cekanova, K.
    MORE WOOD, BETTER MANAGEMENT, INCREASING EFFECTIVENESS: STARTING POINTS AND PERSPECTIVE, 2017, : 170 - 178
  • [42] Comprehensive technical risk indices and advanced methodologies for power system risk management
    Yaghoubi, Elaheh
    Yaghoubi, Elnaz
    Maghami, Mohammad Reza
    Jahromi, Mehdi Zareian
    ELECTRIC POWER SYSTEMS RESEARCH, 2025, 244
  • [43] Implementation of a comprehensive clinical risk management system in a university hospital
    Buchberger, Wolfgang
    Schmied, Marten
    Schomaker, Michael
    del Rio, Anca
    Siebert, Uwe
    ZEITSCHRIFT FUR EVIDENZ FORTBILDUNG UND QUALITAET IM GESUNDHEITSWESEN, 2024, 328 : 18 - 25
  • [44] Comprehensive Peri-Operative Risk Assessment and Management of Geriatric Patients
    Theodorakis, Nikolaos
    Nikolaou, Maria
    Hitas, Christos
    Anagnostou, Dimitrios
    Kreouzi, Magdalini
    Kalantzi, Sofia
    Spyridaki, Aikaterini
    Triantafylli, Gesthimani
    Metheniti, Panagiota
    Papaconstantinou, Ioannis
    DIAGNOSTICS, 2024, 14 (19)
  • [45] Current comprehensive assessment and management of women at increased risk for breast cancer
    Hollingsworth, AB
    Singletary, SE
    Morrow, M
    Francescatti, DS
    O'Shaughnessy, JA
    Hartman, AR
    Haddad, B
    Schnabel, FR
    Vogel, VG
    AMERICAN JOURNAL OF SURGERY, 2004, 187 (03): : 349 - 362
  • [46] Comprehensive risk assessment and management of petrochemical feed and product transportation pipelines
    Gharabagh, M. Jabbari
    Asilian, H.
    Mortasavi, S. B.
    Mogaddam, A. Zarringhalam
    Hajizadeh, E.
    Khavanin, A.
    JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2009, 22 (04) : 533 - 539
  • [47] Risk assessment and anesthetic management of patients with Williams syndrome: a comprehensive review
    Matisoff, Andrew J.
    Olivieri, Laura
    Schwartz, Jamie M.
    Deutsch, Nina
    PEDIATRIC ANESTHESIA, 2015, 25 (12) : 1207 - 1215
  • [48] Based on the Agent Students Comprehensive Quality Fuzzy Assessment Expert System
    Wang Yun Cheng
    Chen Chu Xiang
    Zhou Chun Hua
    Wu Shan Ming
    PROCEEDINGS OF THE 2012 24TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2012, : 3132 - 3135
  • [49] Based on the agent students comprehensive quality fuzzy assessment expert system
    College of Science, Information Engineering University, Zhengzhou 450000, China
    Proc. Chin. Control Decis. Conf., CCDC, (3132-3135):
  • [50] Impact Assessment of a Comprehensive Department Quality Improvement Program Reporting System
    Werner-Wasik, M.
    Harrison, A. S.
    Wilson, K.
    Clancy, D.
    DiNome, J. W.
    Shi, W.
    Babinsky, L.
    Hurwitz, M. D.
    INTERNATIONAL JOURNAL OF RADIATION ONCOLOGY BIOLOGY PHYSICS, 2019, 105 (01): : E611 - E611