共 50 条
- [31] Hybrids acceptance tools for the CMS Phase-2 Tracker Upgrade JOURNAL OF INSTRUMENTATION, 2022, 17 (06):
- [32] Commissioning of the test system for PS and 2S hybrids for the Phase-2 Upgrade of the CMS Outer Tracker JOURNAL OF INSTRUMENTATION, 2024, 19 (04):
- [33] Simulation of the signal propagation for thin-gap RPC in the ATLAS Phase-II upgrade NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2023, 1052
- [34] Test system for the service hybrid of the 2S module for the CMS Phase-2 Outer Tracker upgrade JOURNAL OF INSTRUMENTATION, 2022, 17 (03):
- [35] Beam test results of silicon sensor module prototypes for the Phase-2 Upgrade of the CMS Outer Tracker JOURNAL OF INSTRUMENTATION, 2021, 16 (12):
- [36] Power, readout and service hybrids for the CMS phase-2 upgrade JOURNAL OF INSTRUMENTATION, 2022, 17 (03):
- [37] CMS Outer Tracker Phase-2 Upgrade module noise and mitigation JOURNAL OF INSTRUMENTATION, 2022, 17 (12):
- [39] Performance Requirements for the Phase-2 Tracker Upgrades for ATLAS and CMS CONNECTING THE DOTS 2016, 2016, 127
- [40] VHSIC PHASE-2 TEST REQUIREMENTS FOR THE DEPOT AUTOTESTCON 89 CONFERENCE RECORD: SYSTEMS READINESS TECHNOLOGY CONFERENCE - AUTOMATIC TESTING IN THE NEXT DECADE & THE 21ST CENTURY, 1989, : 289 - 295