Deviation correction strategy for the earth pressure balance shield based on shield–soil interactions

被引:0
|
作者
TANG Liang [1 ,2 ,3 ]
KONG Xiangxun [1 ,2 ]
LING Xianzhang [1 ,2 ,3 ]
ZHAO Yize [4 ]
TANG Wenchong [1 ,2 ]
ZHANG Yifan [1 ,2 ]
机构
[1] School of Civil Engineering, Harbin Institute of Technology, Harbin , China
[2] Heilongjiang Research Center for Rail Transit Engineering in Cold Regions, Harbin , China
[3] Chongqing Research Institute, Harbin Institute of Technology, Chongqing , China
[4] Department of Computer Science, University of California, Irvine, CA ,
关键词
additional position change; deviation correction trajectory; earth pressure balance shield; mechanical model; posture rectification;
D O I
暂无
中图分类号
学科分类号
摘要
The control system presently used in shield posture rectification is based on driver experience, which is marginally reliable. The study of the related theory is flawed. Therefore, a decision-making approach for the deviation correction trajectory and posture rectification load for an earth pressure balance (EPB) shield is proposed. A calculation model of posture rectification load of an EPB shield is developed by considering the interactions among the cutter head, shield shell, and ground. The additional position change during the shield attitude correction is highlighted. The posture rectification loads and shield behaviors results can be solved by the proposed method. The influences of the stratum distribution (i.e., bedrock height in the upper-soft and lower-hard strata) on shield behaviors and posture rectification loads are analyzed. Results indicated that the increase of pitch angle in the upper-soft and lower-hard strata causes a sharp rise in vertical displacement. The bedrock height increases the magnitudes of the required posture rectification moments when hr/D > 0.5. For a tunnel with hr/D ≤ 0.5, the variation of hr/D has little effect on the posture rectification moments. Finally, the posture rectifying curves based on the theoretical model are compared with the target ones based on the double circular arc interpolation method. The required results can be obtained regardless of the soil–rock compound stratum distribution. The maximum rectification moment in the rock layer is almost 12.6 times that in the soil layer. Overall, this study provides a valuable reference for moment determination and the trajectory prediction of posture rectification in compound strata.
引用
收藏
相关论文
共 50 条
  • [31] Analysis of cutting face support pressure for earth pressure balance shield tunneling
    Fang Yong
    He Chuan
    ROCK AND SOIL MECHANICS, 2009, 30 (11) : 3528 - 3532
  • [32] Effects of Soil Conditioning on Tool Wear for Earth Pressure Balance Shield Tunneling in Sandy Gravel Based on Laboratory Test
    Wei, Ying-Jie
    Yang, Yu-You
    Qiu, Tong
    JOURNAL OF TESTING AND EVALUATION, 2021, 49 (04) : 2692 - 2706
  • [33] Study of established mechanism and setting standard of chamber earth pressure for earth pressure balance shield
    Hou, Yongmao
    Yang, Guoxiang
    Ge, Xiurun
    Zheng, Yifeng
    Gu, Chenying
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2012, 31 (03): : 625 - 631
  • [34] The construction technology of Earth Pressure Balance shield in sand stratum section
    Li, Yitao
    Qiao, Shuguang
    Zhang, Zhaohui
    Yong, Langming
    APPLIED MECHANICS AND CIVIL ENGINEERING VI, 2017, : 137 - 141
  • [35] Review on Modeling Control System of Earth Pressure Balance Shield Machine
    Li, Huapeng
    Wang, Dong
    Xi, Jianhui
    Li, Yibo
    ADVANCED MATERIALS SCIENCE AND TECHNOLOGY, PTS 1-2, 2011, 181-182 : 389 - +
  • [36] Construction technology of earth pressure balance shield in watery sandy stratum
    Zhang, Xu-Dong
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2009, 31 (09): : 1445 - 1449
  • [37] Optimal control of an earth pressure balance shield with tunnel face stability
    Shao, Cheng
    Lan, Dongsheng
    AUTOMATION IN CONSTRUCTION, 2014, 46 : 22 - 29
  • [38] Reinforcement Optimization of Starting Stratum of Earth-Pressure Balance Shield
    Ding W.-T.
    Liu K.-Q.
    Wang X.
    Zhu J.
    Li S.-C.
    Ding, Wan-Tao (dingwantao@sdu.edu.cn), 1600, South China University of Technology (45): : 105 - 112
  • [39] Processing model and application of sand and gravel of earth pressure balance shield
    Dai, Renping
    Gong, Quanmei
    Zhou, Shunhua
    Zhou, Guannan
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2010, 43 (SUPPL. 2): : 292 - 298
  • [40] Research on torque of cutterhead for earth pressure balance shield with simulating experimental
    Lu, Qiang
    Fu, Deming
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2006, 25 (SUPPL. 1): : 3137 - 3143