共 50 条
- [11] THE LIBYAN GREAT MAN-MADE RIVER PROJECT PHASE-I .1. MANUFACTURE OF PRESTRESSED CONCRETE CYLINDER PIPE PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1991, 90 : 853 - 879
- [14] THE LIBYAN GREAT MAN-MADE RIVER PROJECT .2. THE WATER-RESOURCE PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-WATER MARITIME AND ENERGY, 1994, 106 (02): : 123 - 145
- [15] Project planning for the great man-made river project Pipes and Pipelines International, 1995, 40 (05): : 16 - 19
- [16] THE LIBYAN GREAT MAN-MADE RIVER PROJECT PHASE-I .2. CONCRETE TECHNOLOGY OF PRESTRESSED CONCRETE PIPE MANUFACTURE PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1991, 90 : 881 - 919
- [17] Libyan Great Man-Made River Project Phase I. Part 1. Manufacture of prestressed concrete cylinder pipe Proceedings of the Institution of Civil Engineers (London). Part 1 - Design & Construction, 1991, 90 (pt 1): : 853 - 879
- [18] Geotechnical investigations for the Great man-made river project, Libya GEOTECHNICAL SITE CHARACTERIZATION, VOLS 1 AND 2, 1998, : 287 - 292
- [19] Libya's choices: Desalination or the Great Man-Made River Project PHYSICS AND CHEMISTRY OF THE EARTH PART B-HYDROLOGY OCEANS AND ATMOSPHERE, 1999, 24 (04): : 385 - 389
- [20] Proposed water management system for the Great Man-made River Project HYDRAULIC ENGINEERING SOFTWARE VII, 1998, 4 : 361 - 379