New reheat furnace for Sollac Dunkirk

被引:0
|
作者
机构
来源
Steel Times | 1997年 / 225卷 / 01期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [41] Reheat furnace supervisory control system at Ipsco Inc.
    Evans, David M.
    Belambe, Ajay R.
    Bovan, Michael R.
    Whitley, Ian G.
    AISE Steel Technology, 2000, 77 (07): : 33 - 36
  • [42] VENEERING OF HUGE ROTARY REHEAT FURNACE SAVES FUEL.
    Anon
    Industrial Heating, 1981, 48 (04):
  • [43] THE THERMAL CHARGE OF THE WALL OF THE LARGE FURNACE-4 AT USINOR, DUNKIRK
    BURTEAUX, M
    MEMOIRES ET ETUDES SCIENTIFIQUES DE LA REVUE DE METALLURGIE, 1983, 80 (09): : 522 - 522
  • [44] Reheat furnace operational effect on hot roll product quality
    Jansto, Steven G. (jansto@cbmmna.com), 1600, Iron and Steel Society (13):
  • [45] USE OF LEVEL 1 CONTROLS FOR OPTIMIZING A REHEAT FURNACE.
    McDonald, Thomas J.
    Velan, Richard
    Iron and Steel Engineer, 1988, 65 (08): : 57 - 61
  • [46] INTERPRETATION OF RADIOACTIVE TRACINGS IN THE CRUCIBLE OF THE SOLLAC-DUNKERQUE FURNACE-4
    DIDELON, F
    REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 1994, 91 (01): : 134 - 137
  • [47] Reheat Furnace Thermodynamic, Kinetic and Combustion Considerations for TMCP Processing
    Jansto, Steven G.
    THERMEC 2018: 10TH INTERNATIONAL CONFERENCE ON PROCESSING AND MANUFACTURING OF ADVANCED MATERIALS, 2018, 941 : 608 - 613
  • [48] Solving reheat furnace duct cracking and fan rotating stall
    Martin, Vern S.
    Kaufman, Steven G.
    Lynn, James W.
    Iron and Steel Engineer, 1999, 76 (07): : 39 - 43
  • [49] DESCRIPTION AND OPERATIONAL TESTS OF DUAL WAVELENGTH REHEAT FURNACE PYROMETER
    RUDOLPH, RG
    IRON AND STEEL ENGINEER, 1983, 60 (03): : 76 - 76
  • [50] VERTICAL SOUNDINGS IN THE WALL OF BLAST-FURNACE NO-4 IN DUNKIRK
    CAPELANI, R
    LIBRALESSO, JM
    BOIDIN, L
    LEBLANC, O
    REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 1987, 84 (02): : 83 - 93