共 50 条
- [26] A SHORT WAY TO KEEP TIME AND COST. Journal of Fluids Engineering, Transactions of the ASME, 1888, 9 : 380 - 385
- [27] TWO METHODS TO COMPUTE EQUIPMENT COST. Consulting engineer Barrington, 1982, 58 (02): : 64 - 66
- [30] MICROPROGRAMMED MINI REDUCES COMPLEXITY AND COST. Electronic Products (Garden City, New York), 1973, 16 (07): : 167 - 170